Laserfiche WebLink
<br />Colorado Water Con~ervation Board <br />I <br />Department of Natunal Resources <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX: (303) 866-4474 <br /> <br />I <br />STATE 0]: COLOI\ADO <br />. <br /> <br />Logistics: <br /> <br />I <br />! <br />I <br />I <br />I <br />I <br /> <br /> <br />Meeting Announceme~t <br />I <br />Cherry Creek Dam Safety Study - Technical Meeting #2 <br /> <br />Members Ld Invited Members of Ibe Technical ReVie~ Temn <br /> <br />Larry LJg, Project Director, CWCB I <br /> <br />Agenda f1 Technical Meeting #2 i <br />I <br />November 16, 1999 from 1:00 pm to 3:00 pm <br />Urban Drainage and Flood Control Dist~'ict, conference room <br />2480 W. 26th Avenue, Suite 156B I <br />Diamond Hill Office Complex, phone (303) 455-6277 <br />Street parking, or use west lot across frJm UDFCD office (please place <br />a note in your front windshield indicatin!g that you are at an official <br />meeting at UDFCD, or see the receptionist for a parking tag) <br />I <br />I <br />Agenda: I <br />1. Welcome and Introduotions . <br /> <br />2. Review draft meeting binutes from the November 3, 1999 meeting located at the City of Greenwood <br />Village municipal builtling I <br /> <br />3. Summarize the NoveJber 9, 1999 conversation between Larry Lang a1nd Bill Miller (Project Manager, <br />I <br />U.S. Army Corps of Engineers, Omaha District) <br />I <br />4. Review the Corps of Engineers study activities as of November 1999 <br /> <br />5. Discuss future roles a~d participation of the Corps of Engineers and National Weather <br /> <br />6. Outline necessary tasJs for proposed Scope of Work for the independe1nt (non-federal) review of the <br />Cherry Creek PMP arlalysis i <br />I <br />7. Adjourn ! <br /> <br />I <br /> <br />Bill Owens <br />Governor <br /> <br />Greg E. Walcher <br />Executive Director, DNR <br /> <br />Peter H. Evans <br />Director, CWCB <br /> <br />To: <br /> <br />From: <br /> <br />Subject: <br /> <br />Date: <br />Location: <br />Address: <br /> <br />Parking: <br /> <br />cc: <br /> <br />Peter Evans, Director, CWCR <br />Hal Simpson, State Engineer, DWR <br /> <br />c: \seca\projects\cherry creek\agenda 11-16-99. doc <br />I <br />