Laserfiche WebLink
<br />,01/04/2000 18: 00 <br />I <br /> <br />402-221-4890 <br /> <br />CORPS OF ENGINEERS <br /> <br />PAGE 05/05 <br /> <br />DRAFT <br /> <br />4 <br /> <br />Sdect~e Criteria <br /> <br />1. The selectee must be familiar with relevant documents such as HMR 51, HMR 52, <br /> <br />HMR 5SA, WMO 332. <br /> <br />2. The selectee must have professional experience deating with the preparation of <br /> <br />and/or review of PMP reports. studies. or manuals. <br /> <br />3, The selectee must have no previous involvement with any part of the July 1995 <br /> <br />site.specific study for the Cherry Creek Watershed. <br /> <br />4. The selectee should not have formed any opinions about or formulated judgments <br /> <br />concerning the Study prior to selection. <br /> <br />peliverables <br /> <br />The written review of the Study shall be completed and delivered to the selector within 3 <br /> <br />months following award of the contract. If a potential selectee cannot provide the review within <br /> <br />this time frame. the selectee should indicate a date upon which the review can be completed and <br /> <br />delivered to the selector. <br />