My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP12584
CWCB
>
Water Supply Protection
>
DayForward
>
1-1000
>
WSP12584
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:16:40 PM
Creation date
8/1/2007 2:14:33 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8240.200.21
Description
Colorado River Basin Threatened and Endangered Species - UCRBRIP - Hatchery Facilities
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
9/1/1992
Author
CWCB
Title
State of Colorado Hatchery Feasibility Study for Endangered Fishes of the Colorado River Basin - Edited Drafts-With Status of Study Tasks and Schedules - 09-01-92
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />001869 <br /> <br />e <br /> <br />e <br /> <br />in 1992 dollars. Other year budget figures should include appropriate escalation fi9~ (- <br />The costs are segregated into the three major components of the recovery facility: fiSb/ <br />hatchery for augmentation; broodstock and refugia holding ponds and a research facility. <br /> <br />Estimeeration and maintenance costs have been developed and are also presented <br />in Ta 1~7, and 9. These costs represent all functions to be performed on-site with the <br />exce' of the research program. Details on the extent of research programs, who will <br />conduct them, and changing priorities over time prevent accurate estimates of costs. <br />These estimates would remain relatively constant regardless of site selection. Oper~2-l <br />and maintenance costs for the research building which are associated with water qu~ <br />pathology and other services connected with the propagation of fish are included. <br /> <br />;<- <br /> <br />f <br /> <br />Utilities are the major variable between water supplies. The cold water supply requires <br />heating, heat recapture and greater pumping costs. Surface water supply would require <br />heating, heat recapture and disinfection costs. <br /> <br />-----? <br /> <br />TABLE 7 <br /> <br /> <br />Pu+ (y\ ~\\CW\~\ <br />?O-c~s. Md. <br />\dJJ>> L ~cr- ~./s <br />-\b,\JJ.- llt\SV' t- <br /> <br />TABLE 8 <br /> <br />TABLE 9 <br /> <br />i <br /> <br /> <br /> <br />[~( ISSUES AND PERMITS <br /> <br />{I/\~""./-W{- ~"" &.0d.I~ J ' <br /> <br />11 <br /> <br /> <br />-....... ---,._;-" <br />'L. _.~-_';, <br /> <br /> <br />. -'-- . <br />;""-,~:,<;,,,...,~;,,~~,ti.4-;:~,:~;'~~;:~~'-2-~~~.~ :;:/-.~,_:.-. <br /> <br />'-' .- ......... ,-'-'--'-' <br />-~:~~;~~~_,/-. -._~~~~~~~ii::;i:::.'~:\;~~.._~:~._~;_~~._~~~:.; <br />
The URL can be used to link to this page
Your browser does not support the video tag.