My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP12584
CWCB
>
Water Supply Protection
>
DayForward
>
1-1000
>
WSP12584
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:16:40 PM
Creation date
8/1/2007 2:14:33 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8240.200.21
Description
Colorado River Basin Threatened and Endangered Species - UCRBRIP - Hatchery Facilities
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
9/1/1992
Author
CWCB
Title
State of Colorado Hatchery Feasibility Study for Endangered Fishes of the Colorado River Basin - Edited Drafts-With Status of Study Tasks and Schedules - 09-01-92
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />TABLE 8 <br /> <br />COSTS AND REQUIRED lAND <br />COLD WELL WATER SUPPLY (SCENARIO 2 - 300,000) <br /> <br />Core Facility <br /> <br />Recovsy Faclily ComponentS <br />RefugiafBroodstock Research <br /> <br />Total <br /> <br />Residences (3) Quarantine BuilcSing <br />Hatchery Bullring BroodsIock Building <br />Mafnl..-lC8IStorage Facility Brood Pcnls <br />Visitor AquarIum Facility BroocIstock Water Supply <br />Prod~ Ponds Other Assaciatelt Costs (a) <br />Stood Ponds (Augment Only) <br />Rearing WaMr Supply <br />Other' As60ciaIed Costs (a) <br /> <br />Totals <br /> <br />$2,664.000 <br /> <br />II <br /> <br />$19,551,000 <br /> <br />AeseaIch Building <br />Outside RUBaR;h <br />l.abtatoIy E'quipment <br />0Iber AssocIided Costs (a) <br /> <br />All Options <br /> <br />I I $25.225.000 'I $979.000 II <br /> <br />II <br /> <br />$3,010,000 <br /> <br />(a) OIher associated costs may include some or all of lhe following: <br />Site work <br />UtMfties <br />Emergency Power Generaliort <br />Gas SlabLation Tower <br /> <br />.....,. __ .......,...............,..M.~..~,~.f'!S..... ....,........ ......... .......................,... .................... .' __ ..............,............... <br />Ernuenc Treatment <br />Yard PIping <br />Oxwen System <br />Monltoting and Alarm System <br />Fish Rearing ~ <br />Process wac<< Conditioning <br />AlE Fees (9.~ of Total) <br />PermJts (.~ of total) <br />Contingency (1&M>> of TocaI) <br />~ costs not fncfuded due 10 lmptlCifted site locaIiOn. <br />~ltlonaf COSI for healecs and heat ecc:hange1S <br /> <br />Operation <br />and <br />Maintenance <br />All Functions <br /> <br />Required <br />Land (b) <br /> <br />Acres <br /> <br />81 <br /> <br />o <br />o <br />~ <br />00 <br />C;.:). <br />C;.:> <br /> <br />(Sj <br />Ul <br />, <br />...... <br />...... <br />, <br />Ul <br />J\.) <br /> <br />e <br />U1 <br />U1 <br /> <br />c <br />;:u <br />U} <br />n <br />o <br />z <br />U} <br />c <br />r <br />-l <br />D <br />Z <br />-l <br />t:l <br />........................ m <br />z <br /> <br />tI <br /> <br />(Sj <br />J\.) <br />...... <br />
The URL can be used to link to this page
Your browser does not support the video tag.