My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP12584
CWCB
>
Water Supply Protection
>
DayForward
>
1-1000
>
WSP12584
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:16:40 PM
Creation date
8/1/2007 2:14:33 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8240.200.21
Description
Colorado River Basin Threatened and Endangered Species - UCRBRIP - Hatchery Facilities
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
9/1/1992
Author
CWCB
Title
State of Colorado Hatchery Feasibility Study for Endangered Fishes of the Colorado River Basin - Edited Drafts-With Status of Study Tasks and Schedules - 09-01-92
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />1219/11/92 <br /> <br />.54 <br /> <br />URS CONSULTANT DENUE~ <br /> <br />12118 <br /> <br />001830 <br /> <br />~QSTS <br /> <br />The feasibility level design prepared for this study Includes aj hatchery building, rearing . <br />ponds for propagation and augmentation stocks. ponds for h;olding broodstock and for <br />refugla. a research building and outsIde research facilities. t~ree on-site residences for <br />hatchery workers. a visitors center and aquarium building. ~nd other related facilities. <br />This design represents a state-of.the-art facility to assis~ in the recovery of the <br />endangered fishes. ' <br /> <br />The design of this recovery facility provides for design and post Information for those <br />components and facilities which would be pan of a model faci(lty. This information could <br />then be used to assist in the final selection of the recov~ry facIlity components; selection <br />of the site, and would also be a starting point for the prellmi~ary design. <br /> <br />Estimated costs for capital construction were developed on !,he basis of feasibility level <br />design information for a comparable unit or system basis an~ are shown In Tables 6, 7,. <br />and 8. The tables are for production scenario 2 . 300.000 fish.itor each of the three water <br />supply types. The estimates are In 1992 dollars. The costs ar~ segregated into the three <br />major components of the recovery facility: the fish hatchery; t~e broodstock and refugla <br />holding ponds and th~ research facility. These cost estlmat~s do not lncludel\costs for- <br />land or Improvements. Including ~xistlng hatchery facilities. ; a.oft..U-~' ~ <br /> <br />Estimated operation and maintenance costs have been developed and are also presented <br />In Tables 6, 7 and 8. These costs represent all functions to be: performed on-site with tt:le <br />exception of the research program. Details on the extent of r~search programs, who will <br />conduct them, and. changing priorities over time prevent acpurate estimates of costs. <br />These estimates would remain relatively constant regardless Qf site selection. Operation <br />and maintenance costs for' the research building which are as~oclated with water quality, <br />pathology and other services connected with the propagation of fish are included. <br /> <br />Full time pf3rsonnel requirements for the facility hav~ been es~mated for each production <br />scenario. Personnel categories Include: facility manager, ~ssistant facility manager, <br />laboratory technician. fish culturlst, maintenance engineer, pla~t engineer and receptionist. <br />The estimated number of full time equivalent personnel are ~, 9, and 10 for production <br />scenarios 1 t 2 and 3 respectively. i <br /> <br />Tables 6, 7 and 8 r:;:;; the r~lative costs for the major components of the recovery X <br />facility and the total cost for each of the water supply types .or production scenario 2 - <br />300,000 fish. Table 9 presents the estimated total costs for t~e recovery facility for each <br />of the three production scenarios for each water supply type. Table 10 presents the <br />estimated cost for Just the core facility" ~ 1.~"*"~ p.....-n~ $......~... " <br />~~~~ ~~ -f1,~ : <br /> <br />~(~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.