Laserfiche WebLink
<br />JfI .. <br /> <br />e <br /> <br />0018J1 <br /> <br />e <br /> <br />STATUS OF STUDY TASKS <br /> <br />TASK ONE - <br /> <br />LITERATURE REVIEW AND REVIEW OF EXISTING <br />PROPAGATION FACILITIES <br /> <br />Status - Complete <br /> <br />TASK 1WO - BIOLOGICAL DESIGN AND CULTURE TECHNIOUES <br /> <br />Status - Complete <br /> <br />TASK THREE - <br /> <br />DEVELOP HATCHERY DESIGN CRITERIA <br /> <br />Status - <br /> <br />This task will be done concurrent and incorporated into the hatchery design <br />task <br /> <br />TASK FOUR - <br /> <br />SITE IDENTIFICATION AND SCREENING <br /> <br />Status - Complete <br /> <br />TASK FIVE - SITE EVALUATION/SCREENING <br /> <br />Status - Additional water (geothermal) and water rights information is being finalized <br />to include in the final Task Five Report <br /> <br />TASK SIX - WATER RESOURCES <br /> <br />Status - This task is being done concurrent with Tasks Five & Seven, and will be <br />incorporated into the Task Five and Hatchery Design Reports <br /> <br />TASK SEVEN - <br /> <br />HATCHERY DESIGN <br /> <br />Status - <br /> <br />Progress continues in the development of the conceptual hatchery design. <br />New information from CDOW regarding. the intensive culture of the <br />endangered fishes is being incorporated. The outline (attached) for the Task <br />Seven Report lists the plans to be included in the conceptual hatchery design. <br />It was determined by the Technical Advisory Committee to combine Tasks 3, <br />6, 7, 8, 9 and 10 and include them in the overall Project Report. A draft of <br />this report was submitted to TAC members on May 28, 1992 for review, and <br />a set of conceptual design plans is scheduled to arrive on June 12, 1992 to <br />T AC members for review with the report. <br />