Laserfiche WebLink
<br /> <br />COLORADO <br />RIVER DELTA <br />BI-NATIONAL <br />SYMPOSIUM <br />PROCEEDINGS <br /> <br />ENGLISH <br />8 <br /> <br />AGENDA <br />PANEL II - CONVEYANCE SYSTEMS <br /> <br />Coordinators: <br /> <br />2:00a.m. - 6:00 p.m. <br /> <br />Moderators: <br /> <br />2:00 a.m. - 3:45 p.m. <br /> <br />Operations Aspects relative to <br />Colorado River Water Management <br />in the Upper Basin <br /> <br />Operations Aspects relative to <br />Colorado River Water Management <br />in the Lower Basin <br /> <br />Plumbing in Yuma Area <br /> <br />Colorado River Water Deliveries <br />Under the 1944 Water Treaty <br /> <br />3:45 a.m. - 4:00 p.m. <br />4:00 a.m. - 5:45 p.m. <br /> <br />Operations Aspects relative to <br />Colorado River Water Management <br />in Mexico <br /> <br />Assignment of Colorado River Water <br />in Mexico for Urban use: Current <br />Situation and Future Perspectives <br /> <br />6:00 p.m. <br />7:30 p.m. - 10:00 p.m. <br /> <br />Francisco A. Bernal and Lorri Gray <br /> <br />Mexico: Alfonso Andres Cortez Lara, CaLEF <br />United States: Bill Rinne, <br />USBR Lower Colorado Region <br /> <br />CONVEYANCE SYSTEMS AND <br />INFRASTRUCTURE IN THE COLORADO <br />RIVER BASIN IN THE UNITED STATES <br /> <br />Tom Ryan, USBR Colorado River <br />Upper Basin Salt Lake City, ur <br /> <br />Jayne Harkins, USBR Colorado River <br />Lower Basin Boulder City, NV <br /> <br />Jim Cherry, USBR, Yuma, AZ <br /> <br />Carlos Marin, Principal Engineer, USIBWC <br /> <br />Break <br /> <br />CONVEYANCE SYSTEMS AND <br />INFRASTRUCTURE IN THE COLORADO <br />RIVER BASIN IN MEXICO <br /> <br />Francisco A. Bernal Rodriguez, Mexican Section, <br />IBWC. Mexicali Office <br />Jose Trejo Alvarado, Director <br />Mexicali Irrigation District <br /> <br />Luis Lopez Moctezuma Torres, <br />Private Consultant, Baja California <br /> <br />Conclusion of Activities <br /> <br />Reception offered by Mexicali Mayor's <br />at Hotel Araiza Inn. <br />