Laserfiche WebLink
<br />n" ~I -. '~~6 <br />~J tJ t ~} ~:, <br /> <br /> <br />IN REPLY REFER TO: <br /> <br />BCOO-4622 <br />PRJ-23.00(MEXIB) <br /> <br />OEe 1 0 1999 <br /> <br />~.. <br /> <br />Honorable John M. Bernal <br />Commissioner <br />International Boundary and Water Commission <br />The Commons, Building C, Suite 310 <br />4171 North Mesa Street <br />E1 Paso TX 79902 <br /> <br />Subject: Mexico's Request to Modify Monthly Delivery Schedule <br /> <br />Dear Commisstoner Bernal: <br /> <br />On November 8, 1999, Mexico requested a modification of the delivery schedule <br />of Colorado River water. The modification requested an increase in the <br />September delivery and a decrease in the December delivery. The modified <br />schedule (enclosed) for total deliveries of Colorado River water to Mexico <br />during calendar year 1999 remains 1.7 million acre-feet. <br /> <br />This increase in the September delivery is required to meet the minimum <br />schedule required by Treaty. Because the September deliveries exceeded the <br />schedule due to flood releases, this change only affects the calculated amount <br />of the excess del ivery. Thus, we have arranged to make the deliveries <br />according to the enclosed revised schedule. <br /> <br />If you have any questions, please call Mr. Rod Carson at 702-293-8090. <br /> <br />Sincerely, <br /> <br />~:&; ~~ <br /> <br />Robert W. Johnson ~ <br />Regional Directo~~ <br /> <br />Enc 1 os ure <br /> <br />{'s" of enclosure <br />1. page\:' J <br />- folloW <br />