My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP12532
CWCB
>
Water Supply Protection
>
DayForward
>
1-1000
>
WSP12532
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:16:31 PM
Creation date
7/30/2007 10:52:26 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8282.400
Description
Colorado River Operations and Accounting - Deliveries to Mexico
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
6/1/2000
Author
State of Baja California - State Water Commission
Title
Water Supply in Blocks for Domestic Use in the County Seats of the State of Baja California - 2000-2025 - English and Spanish Versions
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />00 l491 <br /> <br />, <br /> <br />TECATE: <br /> <br /> . <br />. . <br /> Assigned Volume Volume Used <br />Source of Supply TOTAL m3 Us TOTAL m" Us <br /> . . <br />Colorado River - - 209,928 7 <br />San Jose Watershed, Tecate 3,995,300 127 6,536,801 . 208 <br />River . <br />SanLuisSandy Bed Watershed 3,300,000 105 - - <br />Total:. 7,295,300 231 6,746,729 214 <br /> <br />TIJUANA-ROSARITO: <br /> <br />I <br /> <br /> Assigned Volume Volume Used <br />Source of Supply . TOTAL m3 . Us . TOTALm" Us. <br /> ... <br /> . <br />Colorado River - - 35,831,000 1,136 <br />San Luis Sandy Bed Watershed 80,000,000 2,537 - - <br />Tijuana River* 126,144,000 . 4,000 61,931,000 1,964 <br />La Mision Watershed . 4,730,400 150 900,000 . 29 <br />Rosarito Watershed . .. - - 241,000 8 <br />. <br />. Rio. Tijuana. Watershed 8,483,184 269 . 1,366,000 43 <br />Total: 219,357,584 . .6,956 100,269,000 .3,180 <br /> <br />*Abelardo L. Rodrigez Dam captured water. <br /> <br />. . <br /> <br />As the above tables show, the City of Ensenada is assigned avolume largerthan it <br />uses, although this.assignment includes 9,000,000 m3 annually from the San Luis <br />Sandy Bed Watershed, but lacks the infrastructure to capture and channel these waters <br />aH the way into the city. This is so because the Colorado-Tijuana River Watershed was <br /> <br />. . <br /> <br />never connected to the City of Ensenada, as contemplated in the original project. <br /> <br />. <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.