My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP12532
CWCB
>
Water Supply Protection
>
DayForward
>
1-1000
>
WSP12532
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:16:31 PM
Creation date
7/30/2007 10:52:26 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8282.400
Description
Colorado River Operations and Accounting - Deliveries to Mexico
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
6/1/2000
Author
State of Baja California - State Water Commission
Title
Water Supply in Blocks for Domestic Use in the County Seats of the State of Baja California - 2000-2025 - English and Spanish Versions
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />001514 ; <br />COMO PODEMOS OBSERVAR EN LAS TAB LAS ANTERIORES, LACIUDAD DE. <br />ENSENADA APARENTEMENTE TIENE UN VOLUMEN ASIGNADO MAYOR QUE EL <br />UTILlZADO, NADA MAS QUE EN SU ASIGNACION INCLUYE 9'000,000 M3 ANUALES . <br />DEL ACUIFERO DE LA MESA ARENOSA DE SAN LUIS, PERO CARECE DE <br />INFRAESTRUCTURTA PARA CAPTAR Y CONDUCIR ESAS AGUAS HASTA LA <br />CIUDAD, PUES EL ACUEDUCTO RIO COLORADO-TIJUANA, NUNCASE CONECTO <br />A LA CIUDAD DE ENSENADA COMO SE CONTEMPLO EN EL PROYECTO <br />ORIGINAL. <br /> <br />. <br />I <br /> <br />DE ACUERDO A LO ANTERIOR, SI AL VOLUMEN ASIGNADO A LA CIUDAD DE <br />ENSENADA LE RESTAMOS.EL DE LA MESA ARENOSA OBTENEMOS UN DEFICIT, <br />EL CUAL HASTA LA FECHA SE HA RESUELTO SOBREEXPLOTANDO LAS <br />FUENTES DE ABASTECIMIENTO CON CAPACIDAD E INFRAESTRUCTURA <br />EXISTENTE. <br /> <br />EN LA CIUDAD DE MEXICALI EL VOLUMEN DE AGUA UTILlZADA ES MAYOR QUE <br />EL ASIGNADO, SE HA PODIDO UTILlZAR MAS AGUA DE LA ASIGNADA DEBIDO A <br />LA DISPONIBILlDAD DE VOLUMENES EXCEDENTES EN EL DISTRITO DE RIEGO <br />No. 14, PERO LA INFRAESTRUCTURA EXISTENTE ESTA L1MITADA VAL NO <br />TENER EXCEDENTES HABRA QUE REGULARIZAR LOS VOLUMENES <br />ASIGNADOS. <br /> <br />EN LO QUE RESPECTA A LA CIUDAD DE TECATE PODEMOS DECIR QUE SU <br />DEMANDA ES MENOR A SU ASIGNACION, PERO VA SE ENCUENTRA MUY <br />CERCAS DEL LIMITE. <br /> <br />. <br /> <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.