Laserfiche WebLink
<br />0015J4 <br /> <br />---J <br /> <br />. <br /> <br />Piedra, with a capacity of about 50 million m3, and located above the elevationof500 . <br /> <br />MSNM. <br /> <br />c) LA PIEDRA - ENSENADADAM. <br /> <br />. . <br />. . <br /> <br />With a length of about 50 kilometers, La Piedra Dam would interconnect with La Mision <br />Ensenada Aqueduct. After the existing pumping station, to continue through the. <br />existing line up to the City of Ensenada.Tanks of Morelos. When.beginning the <br />Aqueduct, we would build a processing plant for potable water, with the capacity to <br />deliver water not only to Ensenada, to the South of the City of Tijuana and Rosarito. <br />The waterwould be supplied by gravity,. reducing the zones that currently are supplied <br /> <br />by pumps. <br /> <br />. <br /> <br />Project Description <br /> <br />Cost in Millions $ <br /> <br />a) Interconnection of wells <br /> <br />...360 <br /> <br />b) Conduit line Sandy Table - PBa <br /> <br />2,240 <br />.2,500 <br />235 <br /> <br />c) Conduit line La Piedra - PBa, <br />includes pumping stations; <br />d) Conduit line La Piedra - <br />. Ensenada (includes Rosarito & <br />Tijuana. . . <br />e) Las.Auras Dam (capacity <br />4.000,OOOma) ... <br />. f) La Piedra Dam (capacity <br />50,000,000 ma) <br />g) La Piedra Purifying Plant <br /> <br />Sub-Total: <br /> <br />45 <br /> <br />h) Research & Projects <br />Total <br /> <br />110 <br />20 <br />5,510 <br />92 <br /> <br />5,602 <br /> <br />. <br /> <br />18 <br />