Laserfiche WebLink
<br />0015J2 <br /> <br />~ <br /> <br />It <br /> <br />COASTAL ZONE BLOCK SUPPLY <br /> <br />According to the above, we may conclude that besides the use provided by the local <br />sources, in 2025 the. Coastal Zone will require an additional. 7 ,690 lis, which we propose <br />are captured from the Colorado River. We propose two options fordoing so; The first <br />one would be to capture the volume assigned to the Sandy Table, integrating the <br />additional usage into the right margin oftheColorado River. The second option would <br />be to capture it directly from the All American Canal, at the point where negotiations <br /> <br />. . . <br />. . . <br /> <br />would dictate and which would benear the actuaIP.8.0 zon~, where the pumping of <br /> <br />. . <br />. . <br /> <br />the current Aqueduct begins. This is based on the' premise that the connection to the <br />All American Canal would be the simplest and most inexpensive; but would require <br /> <br />diplomatic negotiations. <br /> <br />It <br /> <br />[PLEASE REFER TO THE ORIGINAL DOCUMENT TO BORDER ARf:A MAP. <br />LOCATED BETWEEN PAGES 23 & 24] <br /> <br />4. CONSTRUCTION DESCRIPTION AND ESTIMATED COSTS . <br /> <br />. . . <br />Considering table above, in 'which we show the future municipal seats' demands, we <br />may conclude that the usage for the year 2025 will.be as follows: . <br /> <br />Location <br /> <br />Q Daily Average <br />Required (Vs) <br /> <br />LocalVs <br /> <br />Proposed Supply Sources <br />Colorado River Vs S!:Indy Table <br /> <br />Mexicali <br />Tecate <br />Tijuana - Rosarito <br />Ensenada <br /> <br />.3,611 <br />416 <br />7,430 <br />1,150 <br />14,632 <br /> <br />200 <br />419 <br />687 <br />1,306 <br /> <br />1,011 <br />105 <br />4,474 <br />178 <br />. 5,776- <br /> <br />2,600' <br />111 <br />2,537 <br />285. <br />5,533* <br /> <br />. <br /> <br />* Assigned volumes. '.' <br />- Must acquire irrigation rights for these volumes. <br /> <br />16 <br />