Laserfiche WebLink
<br />GG14 :97 <br /> <br />. <br /> <br />BASIC FIGURES FOR THE PROJECT <br /> <br />~ <br /> <br />Current Population (2000) ..567,830 people <br />Project Population (2025) 832,076 people <br />. <br />Average DoWry 375 IIh/d <br /> . <br />Average Daily Use 3,611 115 <br /> . .. <br />Maximum Daily Use 5,417115 <br />. <br />Maximum Use -Schedule 10,834 115 <br />Daily Coefficient Variation 1.5 <br />. . <br />Hourly Coefficient Variation 2.0 <br /> <br />COASTAL ZONE <br /> <br />This zone is comprised of the Cities of Tecate, Tijuana, Rosarito, and Ensenada. An <br /> <br />individual analysis by cities yield the following results: <br /> <br />It <br /> <br />TECA TE: <br /> <br />Tecate receives its supply primarily from local sources, underground waters from the <br />Rio Tecate Watershed. Besides, in a small proportion, it uses superficial waters from <br />the Colorado River. Through the. Las Auras- T ecate Watershed, that was interconnected <br />to theGolorado-Tijuana Aqueduct, when it is in operation, or from the Carrizo Dam, <br /> <br />when the Colorado- Tijuana Aqueduct is not in service. <br /> <br />For the year 2025, the City ofTecate will have an additional demand of 185 lis beyond <br /> <br /> <br />the current demand. We propose to nieetthisadditional demand with waters from the <br /> <br /> <br />Rio Colorado. The basic figures for the City of Tecate Project are as follows: <br /> <br />t <br /> <br />11 <br />