My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC12494
CWCB
>
Water Supply Protection
>
DayForward
>
1-1000
>
WSPC12494
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:16:26 PM
Creation date
7/27/2007 9:52:32 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8283.200
Description
Colorado River Computer Models - Colorado River Decision Support System
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
1/1/1995
Author
Colorado DNR
Title
Colorado River Decision Support System Overview - With Related Meeting Materials- RE-CRDSS Development-Etc - Report 01-01-95 - Meeting 05-31-95
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Scenario on Water Resource Planning - Evaluate Basin Development <br />Proposal <br /> <br />The water resource planning model of CRDSS could be used by <br />CWCB personnel to evaluate a proposed water project on a river on the <br />western slope. The CWCB personnel could identify a level of project <br />development that would not adversely impact decreed water rights and that <br />establishes the project's feasibility on a technical and economic basis. <br />Infonnation development actions can be perfonned using data management <br />and modeling functions accessed through the CRDSS interface. The Map <br />Utility can be used to identify possible locations for development. A <br />development plan can be defined using a spreadsheet utility to compile and <br />edit water rights priorities, amount, and timing. These data can then be <br />merged with the other basin water rights and baseline conditions to <br />establish input to the Water Resource Planning Model. An overplot of the <br />time series output for the baseline or comparison case can be obtained to <br />assess the impact of the proposed project on other water resources. <br /> <br />Scenario on Evaluating Operational Strategies for the Colorado River <br /> <br />The Colorado River Basin Simulation Model can be used to <br />evaluate the impact of modified operating criteria on reservoir elevations <br />and contents, on water supply, power generation, Upper Basin Yield and <br />various other system components. For example, the impact of adopting <br />various Lower Basin shortage and surplus criteria can be modelled to <br />determine their impact on Upper Basin reservoir elevations and contents, <br />and Upper Basin yield, both on a short and long tenn basis. This would <br />allow policy makers to make a decision on this issue based on sound <br />technical infonnation. <br /> <br /> <br /> <br />8 <br /> <br />ALFALFA (756 acres) <br />WHEAT (420 acres) <br />PEACHES (452 acres) <br />III SOY BEANS (513 acres) <br /> <br />-SIortlp- <br /> <br /> <br /> Policy A <br />~ <br />..J <br />u. <br /> TIME <br /> 0 <br /> CJ <br /> Q <br /> Baselln. 0 <br /> -....J <br /> W <br /> ..J <br /> u. <br /> TIME <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.