My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC12494
CWCB
>
Water Supply Protection
>
DayForward
>
1-1000
>
WSPC12494
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:16:26 PM
Creation date
7/27/2007 9:52:32 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8283.200
Description
Colorado River Computer Models - Colorado River Decision Support System
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
1/1/1995
Author
Colorado DNR
Title
Colorado River Decision Support System Overview - With Related Meeting Materials- RE-CRDSS Development-Etc - Report 01-01-95 - Meeting 05-31-95
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />DEVELOPMENT SCHEDULE <br /> <br />Feasibility Study <br />(November 1992 - January 1993). <br /> <br />A CRDSS needs analysis and feasibility study has been completed <br />which provides a plan for the development and continuing operation and <br />maintenance of the CRDSS. It contains an inventory of the various needs <br />for such a system as communicated by a wide variety of water users, and <br />describes the models, data, user interfaces, and system architectures <br />required to support these needs. Preliminary cost estimates for the CRDSS <br />were also made. <br /> <br />Design and Development (1994-1998). <br /> <br />Phase I (January 1994 - May 1994). <br /> <br />Phase I was the discovery, evaluation, and preliminary design <br />period of the CRDSS project, and was approximately 4 months in duration. <br />Phase I involved an inventory of existing databases, basin simulation <br />models, water resource planning models, and consumptive use models. <br />After the inventory was complete, databases and models were evaluated. <br />The products of Phase I were a database roadmap, and recommended <br />models for basin simulation, water resource planning, and consumptive use. <br />The data required for the models were identified and cross-referenced <br />against the database road map. <br /> <br />Phase IIa (May 1994 - January 1995). <br /> <br />Phase II consists of the remainder of Years 1 (Phase IIa) and 2 <br />(Phase lIb). The early part of Phase II consists of detailed design and model <br />porting. The latter part involves implementation of the models and <br />population of the databases. <br /> <br />The CRDSS database will be designed with the flexibility to <br />incorporate additional types and amounts of data. A prototYpe system will <br />be designed to demonstrate "proof of concept" for the following models <br />(and associated databases): a) USBR "Colorado River Basin Simulation <br /> <br />Model (Big River Model)", b) Water Resource Planning Model, and c) <br />Consumptive Use Model. The Water Resource Planning Model and the <br />Consumptive Use Model will be implemented for the Gunnison River Basin <br />in the prototype system by the Year 1. Also during this period, data <br />collection will be initiated in other river basins to facilitate Year 2 model <br />development. <br /> <br />A key component of the user involvement program is <br />establishment of a prototype computer system in a Briefing Room at the <br />CWCB. This system will allow potential users to test the CRDSS as it is <br />being developed and provide feedback to the CRDSS Project Team. <br /> <br />Phase lIb (2nd Year. 1995/1996). <br /> <br />Database and model development efforts will continue in Year 2. <br />Operational water resource planning and consumptive use models will be <br />developed for the Yampa, Upper Colorado, San Juan, White and Dolores <br />Rivers. It is also expected that the USBR Colorado River Basin Simulation <br />Model will be operational at the end of the second year. <br /> <br /><=> <br />c::J <br />C.;J <br />C,;) <br />--...J <br />CJl <br /> <br />Phases III and IV (3rd and 4th Year. 1996/1998). <br /> <br />The last two years of the CRDSS project will include real time <br />data collection, the development of a water rights and administrative model, <br />river forecasting model, stochastic flow model and demand forecast model. <br /> <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.