Laserfiche WebLink
<br />Discussion of Facilitation for Future Meetings <br /> <br />Russell George introduced the agenda proposing the use of a facilitation team for future <br />IBCC meetings. The Committee was very supportive of th e idea. Many members felt that <br />Director George’s participation as a Committee member would be enhanced if he <br />wouldn’t have to facilitate the meetings. The decision was made to contract for a <br />facilitation team. <br /> <br />Director George briefly discussed the state R FP process and how the contract would go <br />out for bid. The HB - 1400 money made roughly $50,000 available for facilitation. The <br />hiring process would most likely take 1 - 2 months to complete. <br /> <br />Meeting Times and Location for Future Meetings <br /> <br />th <br />The next meeting wil l be held on August 9 in Pueblo in conjunction with the Arkansas <br />Basin Roundtable. The Arkansas Roundtable will provide an educational presentation on <br />their basin for Committee members. The decision was made that future meetings will try <br />to be scheduled in conjunction with roundtable meetings and that the roundtable hosting <br />will provide an educational presentation on their basin. <br /> <br />th <br />The September meeting was scheduled for September 12 in Alamosa before the Rio <br />Grande Roundtable meeting. The meeting will s tart at 12:00 and will begin with a lunch. <br /> <br />Agenda Items for Next Meeting <br /> <br />Reports from education and needs assessment working groups <br /> <br />Educational presentation from Arkansas Roundtable <br /> <br />Discussion of SB 179 criteria and guideline draft <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />