Laserfiche WebLink
<br />e <br /> <br />e <br /> <br />e! <br /> <br /> Table 13 <br /> Precipitation Depths (inches) for I-Percent Chance Exceedence Event <br /> 2-Day General Rain Event on the Dolores River <br /> Areally Distributed Precipitation <br /> SPECIFIC 1ST CONC 2ND CONC 3RD CONC 4TH CONC 5TH CONC 6TH CONC <br /> West Fork Dolores Dolores Dolores Dolores Lost Canyon <br />Time "mainstem" Bear Creek <br /> near Stoner above Rico Upper Mid Mid Lower Creek <br />I-hour 0.49 0.44 0.47 0.47 0.45 0.42 0.44 <br />2-hour 0.83 0.73 0.78 0.79 0.76 0.69 0.72 <br />3-hour 1.16 1.01 1.08 1.10 1.06 0.94 0.99 <br />6-hour 1.91 1.65 1.76 1.81 1.69 1.51 1.60 <br />l2-hour 3.07 2.57 2.78 2.86 2.69 2.36 2.52 <br />24-hour 3.81 3.23 3.38 3.57 3.33 2.96 3.13 <br />48-hour 4.97 4.30 4.49 4.70 4.44 3.91 4.14 <br /> <br />7.5 HMS Basin Parameters for 1 % Storm. Based on the HMS model calibrated for the <br /> <br />September 1970 storm event, the following parameters were used in the HMS model for the 1 % <br /> <br />general storm. The loss rates used were: Initial Loss = 0.80 inch (the same as used for the 1970 <br /> <br />storm), and Constant Loss = 0.19 to 0.22 inch per hour. The constant loss rate of 0.19 inch per <br /> <br />hour was used on the West Fork and on the East Fork upstream of Dolores Upper Mid/Bear <br /> <br />Creek. A constant loss rate of 0.22 inch per hour was used for Dolores Mid, Dolores Lower, <br /> <br />Dolores Lower Out, Dolores at Dolores, Dolores Out, Lost Canyon Creek, and Lost Canyon <br /> <br />Creek Out. The baseflow parameters used were: Initial Baseflow = 1.0 cfs per me (based on a <br /> <br />flow of 500 cfs estimated for the Dolores gage at the start of the 5 October 1911 flood event), <br /> <br />Recession Constant = 0.65 (ratio of present baseflow to baseflow one day earlier), and Threshold <br /> <br />Q = 0.2 (ratio of peak flow). The subbasin unit hydro graph parameters and upper Dolores River <br /> <br />S-curve used in the HMS model for the 1970 flood event were used for the 1 % flood. The <br /> <br />Muskingum routing parameters developed for the HMS model for the 1970 flood event, listed in <br /> <br />Table 9, were used for the 1 % flood event. <br /> <br />27 <br />