Laserfiche WebLink
<br />Supplies : The supplies are split between copy costs and long distance calling costs. We expect to use <br />a pproximately $100 for copies including the hardcopies of the survey , Institutional Review Board <br />application, and final report. At $0.05 per page, it allows for 2000 copies over the course of the <br />project. The remaining $ 80 in supplies is allocated for long distance charges incurred w hile <br />contacting roundtable members to gather contact information and calling water stakeholders to <br />recruit for participation in the survey. The univer sity long distance rate is $0.08 , allowing for 1000 <br />minutes of long distance calls over the course of the project. <br /> <br />Travel to Roundtable Meetings : $ 365 is allocated for travel to two Colorado basin roundtable <br />meetings (April and September , each roundtrip is 432 miles x 2 = 864 miles ) to implement the <br />survey and present the findings, travel to meet with the ro undtable chair to discuss implementation <br />of the survey if needed (will arrange meeting in Denver, 121 miles) , and to travel to one IBCC <br />Education Subcommittee meeting to present the findings (roundtrip 121 miles) . The university <br />mileage reimbursement rate is $0.33 per mile, for a total of 1106 miles. <br /> <br />Indirect : The state negotiated indirect cost rate with Colorado State University is 33%, for a total of <br />$ 4,322 in indirect costs. <br /> <br />4 <br /> <br />