My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Concept PaperCapacityBuildingforRoundtablesVer
CWCB
>
IBCC Process Program Material
>
Backfile
>
Concept PaperCapacityBuildingforRoundtablesVer
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2009 6:01:01 PM
Creation date
7/26/2007 11:12:18 AM
Metadata
Fields
Template:
IBCC Process Program Material
Title
Concept Paper Capacity Building for Roundtables
Date
11/30/2006
IBCC - Doc Type
Program Planning, Budget & Contracts
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Concept Paper for Roundtable Capacity Building <br />Page 4 of 3 <br /> <br />Annex 1 <br />Roundtable Capacity Building - Preliminary Consultan t Time Budget <br />Subject Area and Activity Hours <br />General Preparation <br /> <br />Conference #1 with DNR <br />2 <br />Conference #2 with DNR <br />2 <br />Conference #1 with CDM <br />3 <br />Conference #2 with CDM <br />3 <br />Draft Capacity Building Detailed Plan <br />3 <br />Revision input from DNR and CDM <br />2 <br />Meeti ngs to review plan <br />3 <br />Conferences to select Roundtable and brief <br />4 <br />Capacity Building for Roundtable A <br /> <br />Preliminary calls and meetings <br />2 <br />Planning with Chair and CDM/DNR <br />4 <br />Prepare for Roundtable Meeting #1 in which Capacity Building event take <br />place <br />3 <br />Roundtable Meeting #1 <br />6 <br />Debrief Meeting #1 and Plan for Meeting #2 <br />2 <br />Prepare for Roundtable Meeting #2 in which Capacity Building event take <br />place <br />2 <br />Roundtable Meeting #2 <br />6 <br />Debrief Meeting #2 and Plan for Meeting #3 <br />3 <br />Midcourse meeting with DNR and CD M <br />2 <br />Roundtable Meeting #3 <br />6 <br />Debrief Meeting #3 and Plan for Meeting #4 <br />2 <br />Prepare for Roundtable Meeting #4 in which Capacity Building event take <br />place <br />3 <br />Roundtable Meeting #4 <br />6 <br />Debrief Meeting #4 <br />2 <br />Time for process evaluation <br />2 <br />Summary meeting with DNR and CDM <br />2 <br />Draft report on Roundtable A <br />2 <br />Capacity Building for Roundtable B <br /> <br />Preliminary calls and meetings <br />2 <br />Planning with Chair and CDM/DNR <br />4 <br />Prepare for Roundtable Meeting #1 in which Capacity Building event take <br />place <br />3 <br />Roundtable Meeting #1 <br />6 <br />Debrief Meeting #1 and Plan for Meeting #2 <br />2 <br />Prepare for Roundtable Meeting #2 in which Capacity Building event take <br />place <br />2 <br />Roundtable Meeting #2 <br />6 <br />Debrief Meeting #2 and Plan for Meeting #3 <br />3 <br />Midcourse meeting with DNR and CDM <br />2 <br />Roundtable Meeti ng #3 <br />6 <br />Debrief Meeting #3 <br />2 <br />Summary meeting with DNR and CDM <br />2 <br />Draft report on Roundtable B <br />2 <br />Summary meetings for pilot review <br />5 <br />Total Hours <br />124 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.