My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007 additional considerations
CWCB
>
IBCC Process Program Material
>
Backfile
>
2007 additional considerations
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2009 6:00:38 PM
Creation date
7/26/2007 10:58:21 AM
Metadata
Fields
Template:
IBCC Process Program Material
Title
Additional Considerations - 2007
IBCC - Doc Type
Program Planning, Budget & Contracts
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />5. Additional facilitation assista nce for roundtables if requested <br />? <br /> <br />Currently have Aqua Engineering available for $15,000/year. <br />? <br /> <br />We can’t increase their involvement because of fiscal rules (we have <br />$25,000 PO for MaryLou’s work with the roundtables and the IBCC <br />POPE WG). <br />? <br /> <br />We could make a sepa rate facilitator available to the roundtables not to <br />exceed $25,000. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.