My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Work Plan 2007 - Notes
CWCB
>
IBCC Process Program Material
>
Backfile
>
Work Plan 2007 - Notes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2009 6:01:30 PM
Creation date
7/26/2007 10:52:44 AM
Metadata
Fields
Template:
IBCC Process Program Material
Title
Work Plan 2007 - Notes
IBCC - Doc Type
Program Planning, Budget & Contracts
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
? <br /> <br />Articulate for them the price of doing nothi ng and work with them to come up <br />with concepts that address the trends we see in the RT’s needs assessments <br /> <br />Public Education, Participation, and Outreach Working Group <br />? <br /> <br />This group can facilitate getting local government’s needs to CWCB and other <br />state deci sion makers and vice - versa; RTs can be link between CWCB and local <br />government. <br />? <br /> <br />Should work cooperatively with the Needs Assessment WG on information/data <br />storage, management, and retrieval <br />? <br /> <br />The groups role would be for materials produced by and about the pr ogram <br /> <br />Needs Assessment Working Group <br />? <br /> <br />Work with CDM to lay out where RTs are relying on SWSI <br />? <br /> <br />Have the group work with RTs on meeting Threshold Criteria #% and tying <br />applications to needs assessments <br />
The URL can be used to link to this page
Your browser does not support the video tag.