My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
pd705-TO4
CWCB
>
IBCC Process Program Material
>
Backfile
>
pd705-TO4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2009 6:01:20 PM
Creation date
7/26/2007 9:21:54 AM
Metadata
Fields
Template:
IBCC Process Program Material
Title
Scope of Work Task Order 2007-004
IBCC - Doc Type
Program Planning, Budget & Contracts
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Exhibit A <br />Scope of Work Task Order 2007 - 00 4 <br />Technical Support for the Basin <br />Roundtables – Project Management <br />Assistance <br /> <br />This task order will provide project management assistance until June 30, 2008 . Consultant will <br />assist State Project Manager in overa ll project management of the Technical Support for the <br />Basin Roundtables. <br />Task 1 Attendance at Basin Roundtable Meetings <br />Project management assistance will include Consultant's Project Director, Technical Director or <br />Task Order Manager, and Basin Advisor attendance at two Basin roundtable meetings for a <br />total of 18 meetings. This assistance will include discussion of progress on the Basin's task <br />orders or information from the Statewide Water Supply Initiative (SWSI) Phase 2 Technical <br />Roundtables based on direction from the CWCB and the State Project Manager, which are as <br />follows: <br />Water Conservation and Efficiency <br /> <br />? <br />Alternatives to Permanent Dry - up of Agricultural Lands <br /> <br />? <br />Prioritizing and Quantifying Recreational and Environmental Needs <br /> <br />? <br />Addressing the Gap Including Alternatives <br /> <br />? <br />Task 2 Task Order Prioritization <br />Based on the input gathered and reflected in the Task Order Matrix, the Consultant will <br />develop a statewide schedule and priority of task orders. The schedule will indicate funding <br />priorities and sou rces. The Consultant will work with the CWCB and the IBCC to make sure <br />that common technical platform issues are considered as part of the prioritization process. <br />Task 3 Project Management <br />The Consultant will provided support to the DNR State Project Man ger for coordination and <br />administration of the Basin Roundtable meetings such as: <br />Developing action items from Basin Roundtable meetings <br /> <br />? <br />Reproduction of presentation material <br /> <br />? <br />Posting of material to the website <br /> <br />? <br />Weekly coordination meeting with the project manager <br /> <br />? <br />Coordination with Basin Roundtable Chairs <br /> <br />? <br />Coordination with Colorado Water Conservation Board (CWCB) <br /> <br />? <br />
The URL can be used to link to this page
Your browser does not support the video tag.