My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
pd705-TO5 - eric edits
CWCB
>
IBCC Process Program Material
>
Backfile
>
pd705-TO5 - eric edits
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2009 6:01:20 PM
Creation date
7/26/2007 9:19:52 AM
Metadata
Fields
Template:
IBCC Process Program Material
Title
Scope of Work Task Order 2007-005
IBCC - Doc Type
Program Planning, Budget & Contracts
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Exhibit A <br />Scope of Work Task Order 2007 - 00 5 <br />Technical Support for the Basin <br />Roundtables – Needs Assessment <br />Development and Project Management <br />Assistance <br /> <br />This task order will provide technical assistance to the Basin Roundtables in developing their <br />needs assessments and provide management assistance until June 30, 2008 . Consultant will <br />assist State Project Manager in overall project management of the Technical Support for the <br />Basin Roundtables. Consultant will develop work plans and/or conduct technical assistance to <br />the roundtables as outlined below and assist State Project Manager in overall project <br />management of the Technical Support for the Basin Roundtables. For all deliverables, associated <br />with tasks described throughout this task order, that produc e data, technical reports, or other <br />products that need to be considered in terms of common technical platform, the Consultant will <br />work with the CWCB to provide this information in a format that it can be tracked and included <br />into databases maintained by C WCB such as the Decision Support Systems , the Water Resource <br />Deleted: and <br />Information Center , and CWCB/DNR websites . <br />Task 1 Development of Needs Assessment Work Plans and <br />Technical Assistance to Basin Roundtables <br />Consultant will provided as needed services to assis t the Basin Roundtables with needs <br />assessments tasks related to their consumptive uses. Each roundtable will be allocated $40,000 <br />for updating their consumptive use needs assessments. The following roundtables did not <br />complete substantial consumptive needs analysis during fiscal year 2006 - 2007, so $80,000 will <br />Deleted: as part of Task Order 2007 - <br />003 <br />be allocated to the following roundtables: Arkansas, North Platte and Southwest. It is expected <br />Deleted: funds ( <br />that as needed requests from the roundta bles will require completion of work plans or technical <br />analysis to examine: <br />Deleted: ) from <br />Deleted: Task Order 2007 - 003 <br />Update of SWSI Identified Projects and Processes <br /> <br />? <br />Implementation status of conservation and reuse programs <br /> <br />? <br />Evaluate potential opportunities for rotational fallowing and/or leasing agreements <br /> <br />? <br />Evaluate groundwater sources that were not included in SWSI Phase I <br /> <br />? <br />Update of demand data <br /> <br />? <br />Identifying water supply vulnerabilities <br /> <br />? <br />Examine agricultural shortages <br /> <br />? <br />
The URL can be used to link to this page
Your browser does not support the video tag.