My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
pd705-TO3-v3 _2_
CWCB
>
IBCC Process Program Material
>
Backfile
>
pd705-TO3-v3 _2_
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2009 6:01:20 PM
Creation date
7/26/2007 9:15:23 AM
Metadata
Fields
Template:
IBCC Process Program Material
Title
Scope of Work Task Order 2007-003
Date
3/7/2007
IBCC - Doc Type
Program Planning, Budget & Contracts
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
March 7, 2007 – Scope of Work Task Order 200 7 - 003 <br />Technical Support for the Basin Roundtables – Needs Assessment <br /> Work Plan Development and Project Management Assistance <br /> <br />Funding Requested: $45,000 <br /> <br />1. 8.2 Yampa/White Basin Roundtable Tasks Authorized under Task Order <br />2007 - 003 <br />The Yampa/White Basin Roundtable non - consumptive needs assessment <br />subcommittee should review the Colorado Basin Roundtable's non - consumptive <br />needs work plan outline so that the two basins can work together in developing a <br />work plan for their basins. The current Yampa/White work plan outline is an element <br />of the Colorado Basin work plan. The Consultant will meet with the non - <br />consumptive needs assessment committee three times between March 2007 and June <br />30, 2007 to discuss progress on the work plan for the non - consumptive needs <br />assessment. <br />In addition to the non - consumptive needs work plan, the Consultant will prepare <br />initial sections of a work plan document for conducting the Energy needs study. The <br />Consultant will meet with the Energy needs subcommittee once during March <br />through June 30, 2007 to discuss further completion of this work plan. <br />Deliverables: 1) Draft and final w ork plan for addressing non - consumptive needs; 2) <br />Initial s ections of a work plan for energy needs. <br />Associated fee: $35,000 <br /> <br />Task 2 Common Technical Platform and Coordination <br />with CWCB <br />Based on information produced in Task 1, the Consultant will work with CWCB to <br />encourage, foster and maintain a common technical p latform. This will include <br />working with CWCB to make sure that information can be included with CWCB <br />standard databases and tools such as the Decision Support Syst em and the Water <br />Resource Information Center . <br />Task 3 Attendance at Basin Roundtable Meetings, Project <br />Management, Coordination, and Administration <br />Project management assistance will include Consultant's Project Director, Technical <br />Director or Task Order Manager, and Basin Advisor attendance at two of the Basin <br />Roundtable meetings for all basins du ring March 2007 through June 30, 2007. This <br />level of support will include attendance at 1 8 meetings. <br />The Consultant will provided support to the DNR State Project Manger for <br />coordination and administration of the Basin Roundtable meetings such as: <br />Developi ng action items from Basin Roundtable meetings <br /> <br />? <br />Reproduction of presentation material <br /> <br />? <br />? <br /> <br /> <br />11 <br />L: \ CWCB IMAGING \ CALEB \ IBCC PROGRAM MATERIAL \ PROGRAM PLANNING BUDGET & CONTRACTS \ CONTRACTS \ CDM TECH ASSISTANCE CONTRACT \ TO 2007 - 003 - NEEDS ASSESSMENT <br />DEVELOPMENT AND PROJECT MANAGEMENT \ PD705 - TO3 - V3 (2).DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.