Laserfiche WebLink
ÙÜÇ Ô Ê <br />SINCE <br />Ø Ï Ö Ô ÏØØËÔÏÖ <br />1948 <br />Ê Ø ËÇÔÚ Ø ÔÏÚ  <br />ê <br />ATTACHMENT 1 <br />Hourly Labor Charges <br />ENGINEER RATES: <br />Principal: $106.00 - $122.00 <br />Engineering Project Manager: $94.00 <br />Senior Design Engineer: $88.00 <br />Design Engineer: $80.00 <br />SURVEYOR RATES: <br />Survey or, Principal: $88.00 <br />Survey o r : $ 8 0 . 0 0 <br />GPS Engineering & Survey ing Lay out/Sur vey $8.00 above regular individual rates <br />Engineering/Survey ing Technician $70.00 - $78.00 <br />Construction Inspection $74.00 <br />Field Assistant $54.00 <br />Drafting Technician, Manual $54.00 <br />General Office/Secretarial $54.00 <br />Lodging, Meal and Transportation Charges <br />Vehicle (per m ile) $ 0.70 <br />ATV/Snowm obile (per day ) $50.00 <br />Other Transportation at cost <br />Meals (each) $ 8.00 <br />L o d g i n g a t c o s t <br />Printing Charges <br />Startup charge (no research) $ 3.00 <br />Startup charge (with research) $ 5.00 <br />Paper Prints (per square foot) $ 0.50 <br />Film Prints (per square foot) $ 4.20 <br />Miscellaneous Charges <br />GPS Equipm ent (per hour) $44.00 <br />Com puter Plotter generated m a ps (each film copy ) $25.00 <br />Com puter Plotter generated m a ps (each paper copy ) $10.00 <br />Out of Pocket Expenses Multiplier of 1.05 x cost <br />The above rates are effective January 1, 2007 <br />