My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5-24-07 Nonconsumptive Needs Assessment Work Group Meeting
CWCB
>
IBCC Process Program Material
>
Backfile
>
5-24-07 Nonconsumptive Needs Assessment Work Group Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2009 6:00:54 PM
Creation date
7/25/2007 1:47:22 PM
Metadata
Fields
Template:
IBCC Process Program Material
Title
Nonconsumptive Needs Assessment Work Group Meeting
Date
5/24/2007
IBCC - Doc Type
Needs Assessment & Technical Support
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />The roles and responsibilities of the Basin Roundtables, NCNA Workgroup, DNR/CWCB/T echnical Contractor, and NCNA <br />Workgroup Steering Committee are shown in the following figure. The Basin Roundtables will be completing their needs <br />assessment updates by the end of 2008 with assistance from DNR, CWCB and the Technical Contractor. The NCNA <br />workgroup will support the Basin Roundtables in completing their needs assessments and will provide a technical forum to <br />discuss common technical platform and consistency across basins. The NCNA Steering committee will work with DNR, <br />CWCB and the Technical Contractor to assist with agenda development, reviewing work products, and provide technical <br />oversight to the process. <br /> <br />~ <br />Complete Needs <br />BRTs Assessments by <br />. end of 2008 <br /> <br />L <br /> <br />DNR/CWCBI <br />CDOW and <br />Technical <br />Contractor <br />Team <br /> <br />Assists Basin <br />Roundtables in <br />completing their needs <br />assessments <br /> <br />L <br /> <br />NCNA <br />Steering <br />Committee <br /> <br />Subset of NCNA Work Group <br />that Assists with Setting <br />Agendas, Reviews Work <br />Products and Provides <br />Technical Oversightto Process <br /> <br />... <br /> <br />--- <br />NCNA <br />Work <br />Group <br /> <br />Work with Roundtables on <br />Completing Non-consumptive <br />Needs Assessments <br /> <br />3. Methodology <br /> <br />The methodology for completing the nonconsumptive needs assessment is shown in the following figure. The methodology <br />focuses on a two step process for evaluating nonconsumptive needs - prioritization and quantification. These steps and <br />their components are described in more detail below. <br /> <br />en - <br />w <br />~ Build Upon <br />~ I Attributes <br />D.. <br /> <br />I. Establish- <br />~ ~ <br />I Priorities <br /> <br />,.- <br />I <br />M <br />P <br />L <br />E <br />M <br />E <br />...--rr- <br />I T <br />A <br />T <br />I <br />o <br />N <br /> <br />... <br /> <br />- <br />"Triage" <br />Where Do <br />We Need <br />Quantification <br /> <br />--+ <br /> <br />- <br />Site-Specific <br />Quantification --+ <br />(fine <br />characterization) <br /> <br />:z <br />o <br />;::: <br /><C <br />u <br />u:: <br />;::: <br />:z <br /><C <br />::;) <br />a <br /> <br />Templates <br />(Coarse <br />Characterization) <br /> <br />~ <br /> <br />3.1. Build Upon Attributes <br /> <br />One of the recommendations from the Statewide Water Supply Initiative (SWSI) Phase 2 Prioritize and Quantify <br />Environment and Recreation Technical Roundtable (ER-TRT) was to use the information it generated as a starting point for <br /> <br />Page 2 of5 <br /> <br />O:\Rinker1olK\SWSf',strategy revised Olju1l07.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.