My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Eric H Feedback - CRWaterAvailabilityScopeDraf
CWCB
>
IBCC Process Program Material
>
Backfile
>
Eric H Feedback - CRWaterAvailabilityScopeDraf
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2009 6:01:08 PM
Creation date
7/25/2007 1:38:19 PM
Metadata
Fields
Template:
IBCC Process Program Material
Title
Water Availability Study of Colorado River and Tributaries
Date
6/25/2007
IBCC - Doc Type
Needs Assessment & Technical Support
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />d. Draft and final editions of a task memo will be prepared presenting <br />comparisons between the three scenarios and the base scenario prepared in <br />in tasks 3 throu gh 6: <br />i. Background of analysis <br />ii. Methodology of analysis <br />iii. Flow and depletion results at the locations indicated in Task 6. <br />IV. Comparisons with Compact flow requirement and allowable <br />depletion ranges (similar to that performed in Task 7). <br />A draft memo would be distributed to Roundtable members for comments <br />prior to ~nalizatiOl{ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - <br /> <br />SCHEDULE <br /> <br />It is elwisioned that this study could be completed in an elapsed time of 12 months. <br />Estimated elapsed times for various tasks are given in Table 2. <br /> <br />Table 2 <br /> <br /> Colorado Water Availability ~hase I Schedulel <br /> Task Elasped Time <br />1. Scope Refinement 3 months <br />2. Literature Review 1 month <br />3. Glossary ofTenns 1 month <br />4. lValidation of State Modelsl 3 months <br />5. Water Allocation Model Refinement 2 months <br />6. StateMod Simulations 1 month <br />7. Summarize StateMod Results 1 month <br />8. Colorado River Compact 2 months <br />9. Hydrological Sensitivity 2 months <br /> Total Study 12 months <br /> <br />BUDGET <br /> <br />The cost components of the above outlined study will consist principally ofCWCB staff <br />time, any required consultants, and associated expenses (i.e. traveL printing. <br />communications. etc.). It is envisioned that cost of the above defined Phase I activities <br />will approximate $300.000. <br /> <br />Colorado River Water A \'ailability Study Scope <br /> <br />8 <br /> <br />June 25. 2007 Draft <br /> <br />Comment: See comments lUlder S.c. A <br />final \vorkshop for roundtable members <br />may be appropriate to facilitate <br />communication. <br /> <br />Comment: Again, see comments under <br />S.c. \Ve may \vant to \vork in a fe\v <br />rowldtable \vorkshops are key points. <br /> <br />Comment: See comments under 4. <br />The Division Engineers are liaisons to the <br />[Olmdtables and may be helpful in <br />\vorking \\'ith the rOlUldtable members on <br />this. Ho\vever, it may take a little more <br />time. <br />
The URL can be used to link to this page
Your browser does not support the video tag.