Laserfiche WebLink
Gunnison Basin Round Table <br /> <br />Project Screening Guidelines (PSC) <br /> <br /> <br /> <br /> <br />Membership <br /> <br />Representation Term Nominees <br /> <br />2 @ Upper Basin 6 months Ralph Grover <br /> Area above the Tunnel 12 months Frank Kugel <br /> <br />2 @ South Basin 6 months Richard Margetts <br /> U ncompaghre, Gunnison River south 12 months Mark Catlin <br /> <br />2 @ North Basin 6 months Peter Kasper <br /> North Delta, North Fork, Grand Mesa 12 months Ron Shaver <br /> <br />After the expiration of the first six - month terms, the next and subsequent terms will be a <br /> <br />12 - month term, and staggered such that three terms will expire every 6 months. <br /> <br />Page 1 of 8 <br />7/25/2007 <br />