Laserfiche WebLink
<br />RCIOOQ06.0H2 <br /> <br />MODEL WAS NOT UPDATED IN EITHER THE 2001 POWER PLANT DROP <br />STRUCTURE/BOAT CHUTE LOMR OR THE 2005 (REVISED JANUARY 2006) <br />CACHE LA POUDRE REMOVAL ACTION LOMR BECAUSE THE CHANGES ASSOCIATED <br />WITH THESE LOMR' S DID NOT AFFECT THE 100-YEAR FLOW SPLITS. <br />2. INCORPORATES THE CHANGES ASSOCIATED WITH THE 2001 POWER PLANT <br />DROP STRUCTURE/BOAT CHUTE LOMR AND THE 2005 (REVISED JANUARY <br />2006) REMOVAL ACTION LOMR. <br />3. COMPUTES DISCHARGES FOR THE 100-, 50-, AND 10-YEAR SPLIT FLOW PATHS <br />DEFINED BY THE SPLIT FLOW CARDS AND COMPUTES THE 100-, 50-, AND <br />10-YEAR WATER SURFACE ELEVATIONS FOR THE MAIN CHANNEL. <br />4. CHANGED THE 87 IN FIELD 5 OF THE JP CARD FOR THE LINCOLN SPLIT FLOW <br />CARDS TO 100. THIS MODELING CHANGE WAS MADE DUE TO THE FACT THAT <br />THE "HARD WIRING" OF DISCHARGES WAS NECESSARY TO ACCOUNT FOR FLOW <br />IN THE MAIN CHANNEL AND THE LINCOLN DIVIDED FLOW PATH WHEN THE UPPER <br />AND LOWER REACHES WERE SEPARATE MODELS. NOW THAT THE MODELS HAVE BEEN <br />COMBINED AND THE FACT ONLY A SMALL PORTION OF FLOW (APPROXIMATELY 4 <br />CFS IN THE 100-YEAR PROFILE) DID NOT RETURN TO THE MAIN CHANNEL OVER <br />LINCOLN AVENUE, IT IS ASSUMED THAT ALL FLOW SPILLED INTO THE LINCOLN <br />DIVIDED FLOW PATH WILL RETURN TO THE MAIN CHANNEL UPSTREAM .oF THE <br />MULBERRY BRIDGE, THIS PROVIDES A MORE AUTOMATED AND CONSERVATIVE <br />MODEL, <br />5. DELETED ALL OF THE 500-YEAR DISCHARGE INPUT FROM ALL QT CARDS FROM THE <br />EFFECTIVE LOWER Q 100-, 50-, AND 10-YEAR FLOODPLAIN MODEL (LOWQ99.DAT) <br />SINCE 500-YEAR WATER. SURFACE ELEVATIONS WERE NOT COMPUTED UTILIZING <br />THIS CORRECTED EFFECTIVE MODEL. <br />6, TRUNCATED THE LEFT OVERBANK GEOMETRY FROM THE GEOMETRY DATA OF <br />CROSS SECTIONS 228117, 229322, AND 229477 DUE TO THESE AREAS <br />NOT BEING HYDRAULICALLY CONNECTED TO THE MAIN CHANNEL. <br />************************************************************************ <br /> <br />************************************************************************ <br />************************************************************************ <br /> <br />THE FOLLOWING CHANGES WERE MADE DURING THE 2005 REMOVAL ACTION <br />LOMR. <br /> <br />************************************************************************ <br /> <br />FILE: RCUPR05. DAT <br />THIS 2005 REMOVAL ACTI.oN LOMR REVISED CONDITION MODEL: <br />9. INCORPORATES AS-BUILT TOP.oGRAPHY FOR THE REMOVAL ACTION <br />SITE THE 1-FT AS-BUILT TOPOGRAPHY FOR THE REMOVAL ACTION <br />SITE WAS DEVELOPED FROM POST-PROJECT LAND SURVEYS CONDUCTED BY <br />BY NORTHERN ENGINEERING IN JUNE 2005, GEOMETRY FOR THE <br /> <br />o 9MARO 6 <br /> <br />16:05:36 <br /> <br />FOLLOWING CROSS SECTIONS WERE UPDATED UTILIZING THE AS- <br />:~L~i~~~~Y TOPOGRAPHY WERE APPRO~RIATEj 229:321., 229477, <br /> <br />************************************************************************ <br /> <br />************************************************************************ <br /> <br />FILE: CEUPR05.DAT <br />THIS 2005 REMOVAL ACTION L.oMR CORRECTED EFFECTIVE MODEL: <br />1. IS BASED ON THE REVISED CONDITION MODEL UPPER-RC. DAT <br />FROM THE POWER PLANT DROP STRUCTURE/BOAT CHUTE LOMR <br />CONDUCTED IN 2001. THE 2001 POWER PLANT DROP STRUCTURE/BOAT CHUTE <br />LOMR REVISED THE 1994 UPPER.DAT FEMA MODEL BY ADDING TWO CROSS <br />SECTIONS (230193 AND 230355) TO REFLECT THE NEW GRADING ASSOCIATED <br />WITH THE DROP STRUCTURE. <br />2. COMPUTES 100-, 50-, AND 10-YEAR WATER SURFACE PROFILES FOR THE <br />MAIN CHANNEL. DISCHARGES UTILIZED TO COMPUTE THE WATER SURFACE <br />PROFILES ARE BASED ON THE SPLIT FLOW DISCHARGES DETERMINED FROM <br />THE 1994 UPPERQ.DAT MODEL. <br />.3...CHANGED .THE..STARTING WATER .sURFACE. ELEVATIONS FOR ALL PROFILES <br />TO MATCH THE OUTPUT OF THE EFFECTIVE LOWER 100-, 50-, AND 10-YEAR <br />FLOODPLAIN M.oDEL FROM THE 1999 TIMBERLINE ROAD LOMR LOMR (LOWQ99,DAT) <br />4. INCORPORATES UPDATED PRE-PROJECT TOPOGRAPHY BETWEEN THE <br />DOWNSTREAM SIDE OF LINDEN STREET, CROSS SECTION 228637, AND JUST <br />DOWNSTREAM OF THE B.N.R,R., CROSS SECTION 229997. TWO SETS OF <br />TOPOGRAPHY WERE UTILIZED TO UPDATE THE HYDRAULIC MODEL. 1-FT PRE- <br />PROJECT TOPOGRAPHY FOR THE REMOVAL ACTION SITE WAS DEVELOPED FROM <br />LAND SURVEYS CONDUCTED BY NORTHERN ENGINEERING IN 2004. PRE-PROJECT <br />TOPOGRAPHY FOR PORTI.oNS .oF THE LEFT OVERBANK THAT WERE NOT <br />INCLUDED IN THE TOPOGRAPHY DEVELOPED FOR THE REMOVAL ACTION SITE <br />WERE .oBTAINED FROM THE COFC. THE C.oFC 2-FT TOPOGRAPHY WAS DEVELOPED <br />FR.oM AERIAL PHOTOS TAKEN IN 1999. GEOMETRY FOR THE FOLLOWING <br />EFFECTIVE CROSS SECTIONS WERE UPDATED UTILIZING THE PRE-PROJECT <br />TOPOGRAPHY; 228637, 228687, AND 229477. WHILE UPDATING THE <br />GEOMETRY FOR CR.oSS SECTION 229477 IT WAS DECIDED TO SHORTEN THE <br />GR DATA FOR THE RIGHT OVERBANK. THUS, CROSS SECTI.oN 229477 <br />WAS SHORTENED BY APPR.oXIMATELY 800 FEET. <br />5, INCLUDES THE ADDITION OF TWO CROSS SECTIONS AT THE DOWNSTREAM <br />(229322) AND THE UPSTREAM (229757) ENDS OF THE REMOVAL ACTION <br />PROJECT SITE. PRE-PROJECT TOPOGRAPHY WAS UTILIZED TO DEVELOP THE <br />GEOMETRY FOR CROSS SECTI.oNS 229322 AND 229757, <br />6, CHANGED THE X3 CARD FOR CROSS SECTION 229477 INTO AN ET CARD AND <br />ADJUSTED THE LEFT ENCROACHMENT STATION OF 6770 .oN THE X3 CARD TO <br />STATION 7165 ON THE ET CARD TO REPRESENT THE INEFFECTIVE FLOW IN <br />THE LEFT OVERBANK CAUSED BY BUILDINGS UNDER CONSTRUCTI.oN IN THE <br />EFFECTIVE CONDITION PHOTO (IMPACTS 500-YEAR FLOWS ONLY) . <br />7. CHANGED THE LEFT ENCROACHMENT STATION OF THE X3 CARD FOR CR.oSS <br />SECTION 229997 FROM STATI.oN 8170 TO STATION 8170.1 SO THAT <br />THE ENCROACHMENT STATION WOULD LIE WITHIN THE GEOMETRY DATA, I <br />8. HAS A -1 INSERTED INTO FIELD 7 OF THE J2 CARD TO COMPUTE <br />CRITICAL DEPTH AT ALL CROSS SECTI.oNS. I <br />************************************************************************ I <br /> <br />I <br />************************************************************************ I <br />. I <br />P:\COFC2003\1O _ Oxbow Levee\LOMR\FinDisk (Final)\Appendix G\FEMA Models\Revised M.odels\RCIOOQ06.d.oc <br /> <br />Page 2 of 49 <br /> <br />. <br /> <br />PAGE <br /> <br />. <br /> <br />. <br /> <br />Created .on 3/9/2006 4:06 PM <br />