My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD10379 (2)
CWCB
>
Floodplain Documents
>
Backfile
>
10001-11000
>
FLOOD10379 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2010 10:15:26 AM
Creation date
7/20/2007 11:08:46 AM
Metadata
Fields
Template:
Floodplain Documents
County
Adams
Arapahoe
Denver
Stream Name
South Platte River
Title
UDFCD South Platte River Program 2003 Routine Maintenance Contract Documents
Date
1/1/2003
Prepared For
CWCB
Prepared By
Urban Drainage and Flood Control District
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Revised 1103 <br /> <br />TABLE OF CONTENTS <br /> <br />ITEM <br /> <br />INVIT1'1TION FOR BID(s) (NOT APPLICABLE FOR 2003) <br /> <br />INSTRUCTIONS TO BIDDER(s) (NOT APPLICABLE FOR <br />2003) <br /> <br />INFORMATION AVAILABLE TO BIDDER(s) <br /> <br />BID <br /> <br />AGREEMENT <br /> <br />BONDS, CONTRACT FORMS AND CERTIFICATES <br /> <br />PAYMENT BOND <br />PERFORi\fANCE BOND <br />INSURANCE CERTIFICATES (TO BE ATTACHED) <br />LETTER OF DAMi\GE GUARANTEE <br />NOTICE OF A WARD AND ACCEPTANCE <br />NOTICE TO PROCEED AND ACCEPTANCE <br />CHANGE ORDER <br />LETTER OF FINAL ACCEPTANCE <br />NOTICE OF FINAL PAYMENT <br />FINAL RECEIPT <br />CONTRACTOR STATEMENT CONCERNING CLAIMS <br />WITHDRAWAL OF STATEMENT OF CLAIM <br />ADDENDA AND MODIFICATIONS <br /> <br />GENERAL CONTRACT CONDITIONS <br /> <br />SCOPE <br />DEFINITIONS <br />THE CONTRACT <br />AUTHORITY OF EXECUTIVE DIRECTOR <br />ENGINEER <br />CONSTRUCTION MANAGER <br />CONSTRUCTION SURVEYS <br />LAND AND RIGHTS-OF- WAY <br />DRAWINGS, SPECIFICATIONS AND SUBMITTALS <br />SUGGESTIONS TO CONTRACTOR <br />CONSTRUCTION SCHEDULE <br />GENERAL SERVICE AND FACILITIES REQUIREMENTS <br />INSPECTION AND TESTING <br />TRADEMARKS, COPYRIGHTS AND PATENTED DEVICES, <br />MATERIALS AND PROCESSES <br />PROTECTION OF WORK, PROPERTY AND SAFETY OF <br />PUBLIC AND WORKERS <br />SUBCONTRACTING <br />CHANGED CONDITIONS <br /> <br />spr\RoutContract <br /> <br />11 <br /> <br />. <br /> <br />. <br /> <br />SECTION SUB-SECTION <br />100 - NA <br />200 - NA <br />300 <br />400 <br />500 <br />600 <br /> 6M <br /> ~ <br /> 603 <br /> @4 <br /> 605 <br /> 606 <br /> 607 <br /> 608 <br /> 609 <br /> 610 <br /> 611 <br /> 612 <br /> 613 <br />700 <br /> 701 <br /> 702 <br /> 703 <br /> 704 <br /> 705 <br /> 706 <br /> +{H <br /> 708 <br /> 709 <br /> 710 <br /> +++ <br /> 712 <br /> 713 <br /> 714 <br /> 715 <br /> 716 <br /> 717 <br /> <br />- <br /> <br />. <br /> <br />- <br /> <br />. <br /> <br />.. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />-I <br />
The URL can be used to link to this page
Your browser does not support the video tag.