My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD10379 (2)
CWCB
>
Floodplain Documents
>
Backfile
>
10001-11000
>
FLOOD10379 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2010 10:15:26 AM
Creation date
7/20/2007 11:08:46 AM
Metadata
Fields
Template:
Floodplain Documents
County
Adams
Arapahoe
Denver
Stream Name
South Platte River
Title
UDFCD South Platte River Program 2003 Routine Maintenance Contract Documents
Date
1/1/2003
Prepared For
CWCB
Prepared By
Urban Drainage and Flood Control District
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />Revised 1/03 <br /> <br />607 <br />CHANGE ORDER <br />2003 SOUTH PLATTE RIVER ROUTINE MAINTENANCE <br />(Project No. 03-01.01) <br /> <br />Order No.: <br /> <br />Date: <br /> <br />,20_ <br /> <br />CONTRACTOR: <br /> <br />It is hereby mutually agreed that when this CHANGE ORDER has been signed by the contracting <br />parties, the following described changes shall be executed by the CONTRACTOR without changing the <br />terms of the CONTRACT, except as herein stipulated and agreed. The OWNER represents that monies <br />appropriated for the improvements are equal to or in excess of the CONTRACT PRICE including this <br />CHANGE ORDER. <br /> <br />Description of change (use attachment if necessary) made to the CONTRACT DOCUMENTS: <br /> <br />Justification: <br /> <br />The CONTRACTOR agrees this CHANGE ORDER is full and only compensation of CONTRACT <br />TIME and CONTRACT PRICE for this change. CONTRACTOR also agrees to furnish all materials <br />and labor and to perform all WORK required to complete the above described changes in accordance <br />with the requirements for similar WORK covered by the CONTRACT, except as otherwise stipulated <br />herein, for the following considerations: <br /> <br />Chanl!e to CONTRACT PRICE <br />Original CONTRACT PRICE $ <br />Current CONTRACT PRICE adjusted by CHANGE ORDERS _ through _ $ <br />The CONTRACT PRICE due to this CHANGE ORDER will be increased <br />(decreased) by $ <br />The new CONTRACT PRICE including this CHANGE ORDER will be $ <br /> <br />Chanl!e to CONTRACT TIME <br />Current CONTRACT Completion Date <br />The CONTRACT TIME will be increased (decreased) by _ Calendar Days <br />The date for completion of all WORK will be <br /> <br />(ENGINEER) <br /> <br />DATE <br /> <br />(OWNER) <br /> <br />DATE <br /> <br />(CONTRACTOR) <br /> <br />DATE <br /> <br />(OWNER) <br /> <br />DATE <br /> <br />(CO-OP AGENCY) <br /> <br />DATE <br /> <br />(OWNER) <br /> <br />DATE <br /> <br />spr\RoutContract <br /> <br />Section 600-(5) <br />
The URL can be used to link to this page
Your browser does not support the video tag.