My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ02179
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ02179
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:44 AM
Creation date
7/19/2007 9:06:14 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
04000000014
Contractor Name
Clear Creek Economic Development Corporation
Contract Type
Grant
Water District
0
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />~ <br /> <br />I <br />I <br />I <br />I <br />i <br />I <br /> <br />I <br />I <br />I- <br />I <br /> <br />I <br /> <br />Preble's Meadow Jumping Mouse and Ute Ladies Tress Orchid are endange~ed species that can impact <br />reservoir projects. Typical habitat of both species does not extend to the elevation of the proposed site. <br /> <br />A potential impact could occur to whooping crane, piping plover, least tern and pallid sturgeon habitat <br />in Nebraska due to depletions of flow in the South Platte River. The impacts and necessary mitigation <br />of depletions in the South Piatte River Basin are currently being evaluated as part of the "Cooperative <br />Agreement For Platte River Research al}d Other Efforts Relating to Endangered Species Habitats Along <br />the Central Platte River, Nebraska" that was entered into between the states of Wyoming, Colorado, <br />Nebraska and other agencies in July 1997; Although the final resolution of this agreement has not been <br />determined to date, interim requirements for new storage projects generally specify replacement of <br />depletions on a one to one basis or payment of a fee to a mitigation fund. <br /> <br />Typical impacts during construction include increased traffic during the construction period and increased <br />dust that result from earthmoving operations. These concerns are typically mitigated to the extent possible <br />by adding water for dust control and providing a traffic control plan. <br /> <br />For the Ball Placer reservoir site, an additional environmental concern is the impact of potentially <br />hazardous materials in the tailings material present at the site. Materials could pose potentially hazardous <br />conditions by increased mobilization of dust during the construction period or by potential leaching of <br />materials to groundwater or the West Fork of Clear Creek. Material could also potentially leach into the <br />water stored in the reservoir. Concerns are greater if the reservoir would be used as a raw water supply <br />since the water use would be much more direct than storage for al1gmentation purposes. <br /> <br />The reservoir site was originally a location evaluated for the Clear Creek/Central City Superfund Site <br />which was listed on the National Priorities List in 1983 due to concerns regarding the tailings material. <br />Environmental sampling was conducted in 1989 and again in 1992 to determine priority cleanup locations. <br />The tailings exhibited low levels of arsenic and lead and it is our understanding that the EP A does not <br />consider the Empire tailings to be part of the Clear Creek/Central City Superfund Site at this time. <br />Correspondence summarizing environmental testing and results is included in the Appendix. It should be <br />noted that limited testing was conducted on the site and additional testing and evaluation of the <br />environmental risk should be done prior to implementation of the reservoir. <br /> <br />WATER RIGHTS <br /> <br />General <br /> <br />An Application for Water Rights was filed in District Court, Water Division NQ 1 of the State of Colorado <br />(Case NQ 01CW290) o~ December 31,2001. The application filed for conditional water rights to divert <br />up to 5 c.f.s. from Bard Creek at the point of diversion for filling the reservoir. For the Ball Placer <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.