Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />i <br />I <br />I <br /> <br />Table 3 <br /> <br />Ball Placer Reservoir Feasibility Study <br />Preliminary Engineer's Opinion of Probable Construction Cost <br />January 31, 2003 <br /> <br />Item No. Description Unit Quantity Unit Cost Item Cost <br />1 Mobilization LS 1 .. $ 20,000.00 $20,000 <br />2 Clearing and Grubbing LS 1 $ 5,000.00 $5,000 <br />" Onsite ExcavationlEarth Fill CY 55,000 $ 7.50 $412,500 <br />.J <br />4 Imported Fill CY 15,000 $ 10.00 $150,000 <br />5 Pond Liner (Single) SF 305,000 $ 0.65 $198,250 <br />6 Soil Cement (Dam Face) SY 10,000 $ 15.00 $150,000 <br />7 Low Flow Outlet Structure LS 1 $ 10,000.00 $10,000 <br />8 12" RCP Drain Pipe LF 110 $ 40.00 $4,400 <br />9 Spillway Riser/Trash Rack LS 1 $ 15,000.00 $15,000 <br />10 24". RCP Prin. Spillway LF 180 $ 80.00 $14,400 <br />11 Spillway Outlet/Energy Dissipator LS 1 $ 10,000.00 $10,000 <br />12 Trickle Channel LF 380 $ 25.00 $9,500 <br />13 Grouted Riprap Outlet Channel CY 170 $ 75.00 $12,750 <br />14 Seeding & Mulching AC 5 $ 2,500.00 $12,500 <br />15 Fencing (Chain"Link) LF 2,600 $ 15.00 $39,000 <br />16 Diversion Stnicture/Flume LS 1 $ 15,000.00 $15,000 <br />17 18" RCP Diversion LF 2,600 $ 40.00 $104,000 <br />18 Manholes EA 6 $ 3,000.00 $18,000 <br />19 Diversion Outlet LS 1 $ 1,000.00. $1,000 <br />20 Pavement/Street Repair SY 1,400 $ 15.00 $21,000 <br /> Subtotal. $1,222,300 <br /> Enviromnental Testing/Report LS $10,000 <br /> Endangered Species Act Mitigation LS $27,500 <br /> P ermi tting LS $10,000 <br /> Contingencies (%) 15 $183,345 <br /> Engineering - Design 6 $73,338 <br /> Engineeling - Construction (%) 10 $122,230 <br /> Total $1,648,713 <br /> <br />- <br />Note: 1. Easement/land acquistion costs not included. <br />2. Additional cost for removal of tailings if required is not included. <br />3. Costs for mitigation of tailing impacts if required is not included. <br /> <br />21 I IPrelimCostOpinion.xls <br />