My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ02166
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ02166
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:43 AM
Creation date
7/18/2007 9:00:04 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153940
Contractor Name
Farnsworth Group, Inc.
Contract Type
Grant
Water District
0
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />e <br /> <br />e <br /> <br />6y./",hJf /IJ <br /> <br />Scope of Services <br />South Platte Diversion Str.ucture Inventory <br />District 2 <br /> <br />Evaluate hydraulic and structural condition of raw water diversion structures along the <br />main stem of the South Platte River in District 2. 22 diversion structures are assumed <br />for estimating man-hours and fee estimate. <br /> <br />1) Research and planning <br />a) Review data provided by CWCS. <br />b) Prepare map depicting structure -locations. The map will be prepared using the <br />structure's GPS location as provided by the CWCS. The map will be used to <br />plan an efficient route to each of the structure. <br />2) Field inventory - visit each project site to make measurements, note structure <br />condition and take pictures. Tasks will include: <br />a) Field observation ' <br />b) Measure and sketch <br />c) Digital photographs . <br />d) Notes regarding condition of the structure and needed repairs <br />3) Report - prepare a report summarizing procedure and work effort. Prepare <br />conceptual repair plan and opinion of probable cost for each structure. The repair <br />plan may be in narrative and/or graphic form. The report will include: <br />a) Narrative describing inventory process <br />b) Location map , <br />c) Cost data documentation <br />d) Structure field sketches <br />e) Ownership (if provided by CWCS) <br />f) Decreed water rights (if provided by CWCS) <br />. g) Photo log <br />h) Condition report <br />i) Conceptual repair plan (narrative and/or graphic) <br />j) Conceptual level opinion of probable cost to repair or replace <br />4) Sample GIS for one structure - sample GIS layers and database will be prepare.d for <br />one structure to demonstrate GIS capabilities and uses. <br />5) Project coordination & meetings <br />a) Kick-off meeting <br />b) Progress meeting <br />c) Final review meeting <br />d) Project coordination <br /> <br />To prepare the project scope and fee estimate, we have assumed that the Colorado <br />Water Conservation Soard will provide: <br />1. Structure location and access map <br />2. Permission across private property to access the structures <br />3. Local contact name and telephone number <br />4. Initial condition report and pictures of the structures <br />5. Ownership <br />6. Decreed water rights <br /> <br />. ' <br /> <br />./" <br />
The URL can be used to link to this page
Your browser does not support the video tag.