My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ02151
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
PROJ02151
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:06:28 AM
Creation date
7/17/2007 2:14:59 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150163
Contractor Name
New Cache La Poudre Irrigating Company
Contract Type
Loan
Water District
3
County
Weld
Bill Number
04-1221
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />New Cache La Poudre Irrigating Company <br />November 19-212003 <br /> <br />Agenda Item 8b <br /> <br />Proiect DescriDtion <br /> <br />The purposes of the project are to provide water storage to equalize ditch flows, to improve the <br />. efficiency and reliability of the NCLPIC system, and provide storage to meet excess demand. Three <br />alternatives were analyzed in the feasibility study: <br /> <br />1. No action. (Approximately $300,000 per year) <br />2.. Purchase storage shares in Glade Reservoir or other large storage development project. <br />(Approximately $1300/ac-ft.) <br />3. Construct equalizer, pipeline, and storage and augmentation reservoirs. ($9,542,000) <br /> <br />Alternative 1, No-action - The no action alternative leaves the system as it is and consequently <br />does not address the NCLPIC's needs, as stated above in the project purpose. Currently, the <br />NCLPIC's supply is approximately 10,000 ac-ft short of demand based on rental water requests. If <br />the NCLPIC follows the no action alternative, it will incur ongoing, unquantified costs associated <br />with the inefficiencies throughout the system in addition to rental water fees of approximately <br />$300,000 per year (at current rental rates) to meet the demands of its shareholders. <br /> <br />Alternative 2,. Purchase storage shares in Glade Reservoir or other large storage <br />development project. (Approximately $1300Iac-ft.) - Plans by the Northern Colorado Water <br />Conservancy District (NCWCD) for development of Glade Reservoir north of Fort Collins provide a <br />potential solution to the problem of lack of storage within the system. The NCLPIC could purchase <br />shares in the reservoir to use for storage. Current projections by the NCWCD for storage in Glade <br />Reservoir are approximately $1300/ac-ft. This option is attractive for overcoming the problem of <br />lack of storage; however, it does not address the operational efficiency issues of the ditch or the <br />need for groundwater augmentation. Additionally, Glade Reservoir would not be available until <br />2012 at the earliest, so this alternative does not address the immediate needs. <br /> <br />Alternative 3, Construct equalizer, pipeline, and storage reservoirs ($9,542,000) - This <br />alternative consists of constructing three reservoirs, a pipeline, and a pumping station near <br />Barnesville. One reservoir would be used as an equalizer to balance flows in the ditch to help <br />overcome operational inefficiencies. The other two reservoirs would be filled during the winter with <br />water pumped from the ditch through the pipeline. These reservoirs would be used for storage <br />and/or groundwater augmentation. <br /> <br />Selected Alternative 3, Construct equalizer, pipeline, and storage reservoirs was selected <br />because it is the most feasible alternative for meeting the NCLPIC's needs for equalizing ditch <br />flows, improving efficiency throughout the distribution system, and for providing storage. The <br />project site is located near Barnesville, approximately 11 miles northeast of Greeley, on the north <br />side of State Highway 392. Specific requirements of the selected alternative are described below: <br /> <br />1. Construct Barnesville Equalizer, an approximately 300 acre-foot equalizer reservoir located <br />directly adjacent to the North Side Extension. This reservoir would serve to stabilize ditch <br />flows downstream and would act as a sedimentation basin for water pumped to storage. <br />The reservoir would include an approximately 5-foot high earthen dam with emergency <br />spillway, and be filled by gravity flow from the ditch. <br />2. Construct Cornish Plains Reservoir, an approximately 1600 acre-foot storage reservoir. <br />3. Construct Drury Reservoir, an approximately 600 acre-foot storage reservoir. <br />4. Construct the Barnesville Diversion Structure to divert water from the ditch to the Barnesville <br />Equalizer. The concrete structure would include a check gate to divert ditch flows and an <br />overflow spillway to attenuate surges in the ditch due to storm events, <br /> <br />Page 3 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.