Laserfiche WebLink
<br /> <br />Hydrology Study - <br />Engineering <br />Autoead DraftinglMapping <br /> <br /> <br />Subtotal <br /> <br />$ 1,200 <br />$ 300 <br />$ 1,500 <br /> <br />. 3. <br /> <br />Outlet W orIes/Pipeline Configuration/Puinp Structure <br />Engineering <br />Autocad Drafting <br /> <br />Subtotal <br /> <br />$ 1,800 <br />$ 300 <br />$ 2,100 <br /> <br />4. Cost Estimates <br /> <br />$ 1. 800 <br />Subtotal $ 1,800 <br /> <br />5. . Feasibility Report. <br /> <br />$ 2.500 <br />Subtotal $ 2,500 <br />TOTAL................. $ 8,800 <br /> <br />II. GEOTECHNICAL INVESTIGATION <br />1. Drilling - 5 holes @ dam sites; 2 Observation wells; 5 percolation test holes <br />Drilling . $ 1,500 <br />Engineering/log holes/utility locates/coordination $ 1,430 <br />Percolation Tests $ 390 <br />Well Materials $ 490 <br />Subtotal $ 3,810 <br /> <br />Subtotal <br /> <br />$ 1.220 <br />$ 1,220 <br /> <br />2. <br /> <br />Laboratory Testing <br /> <br />Subtotal <br /> <br />$ 520 <br />$ 520 <br /> <br />3. <br /> <br />Geotechnical Report <br /> <br />TOTAL ................ $ 5,550 <br /> <br />III. Topographic Survey <br /> <br />1. <br /> <br />Site Survey - check USGS elevations <br /> <br />$ 800 <br />TOTAL ............... $ 800 <br /> <br />IV. Augmentation Analysis - TELESTO Engineering $ 1.500 <br />TOTAL ............... $ 1,500 <br /> <br />TOTAL (1- IV)..... $16,650 <br /> <br />New Cache Feasibility Proposal Page 3 <br />