My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150221 Contract
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150221 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2011 4:01:35 PM
Creation date
7/17/2007 1:17:02 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150221
Contractor Name
San Luis Valley Irrigation District
Contract Type
Grant
Water District
0
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
WHITEING & SNIITH <br />ATTORNEYS AT LAW <br />1136 PEARL STREET, SUITE 203 <br />BOULDER, COLORADO 80302 <br />JEANNE S. WEITEllVG <br />TOD 3. SNIITH <br />June 14, 2006 <br />SENT BY E-MAIL. ORIGINAL <br />TO FOLLOW BY U.S. MAIL <br />Kirk Russell, P.E. <br />Water Supply Planning and Finance Section <br />Colorado Water Conservation Boazd <br />1580 Logan Street, Suite 750 <br />Denver, Colorado 80203 <br />Re: Contract No. C150221 <br />Grantee: San Luis Valley Irrigation District <br />Dear Mr. Russell: <br />PSONE (303)449-2549 <br />FAX (303144-2366 <br />EMAII.tod~alwlLiceinramith.w <br />This letter is to outline the woxk that Whiteing & Smith will provide to the San Luis <br />Valley Irrigation District (the "District") related to Contract No. C15022I. Whiteing & Smith <br />serves as general legal counsel to the District. The total. grant under this contract is $133,555.00 <br />for the Rio Grande Reservoir Multi-Use Enlargement Study (the "Study"). Of that amount, <br />$123,SSSAO has been allocated for Engineering Services under contract with Camp Dresser & <br />McKee. The remaining $10,000.00 will be used by the District for legal services related to the <br />Study. Whiteing & Smith will provide legal assistance and analysis as necessary in support of <br />engineering study including: <br />I. Participate in coordination meetings with the District and CWCB <br />2. Participate in meetings/coozdination with various stakeholder(interest groups <br />3. Review and participate in fatal flaw analysis for wetlands, threatened and <br />endangered species <br />4. Legal analysis as needed on federal, state and local permitting requirements for <br />enlargement of Rio Grande Reservoir <br />
The URL can be used to link to this page
Your browser does not support the video tag.