My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ02146
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ02146
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:42 AM
Creation date
7/17/2007 1:14:49 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150066
Contractor Name
Tilton Lateral, Inc.
Contract Type
Loan
Water District
0
County
Mesa
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />SECTION 6 - ELIGIBLE EXPENSES. The following items are eligible for loan <br />disbursements. <br /> <br />A. Preparing final designs and specifications for the PROJECT. <br /> <br />B. Preparing bid and construction contract documents. <br /> <br />C. Preparing environmental assessment or environmental impact statements, and <br />otherwise complying with the Federal National Environmental Policy Act. <br /> <br />D. Complying with all federal, state, and local regulatory requirements, including the <br />obtaining of all required permits. <br /> <br />E. Fish and wildlife mitigation measures required by federal, state, or local laws and <br />regulations. <br /> <br />F. Actual construction as called for in the design documents and in change orders <br />approved by the CWCS and the BORROWER. <br /> <br />G. Engineering services for construction management, including design and <br />construction management for CWCB-approved change orders. <br /> <br />H. Interest during completion of the PROJECT pursuant to Paragraph A.3 herein. <br /> <br />I. Legal services for reviewing engineering services contracts, reviewing this <br />contract, reviewing construction contract documents, and for complying with all <br />federal, state, and local regulatory requirements. <br /> <br />SECTION 7 - DISBURSEMENT SCHEDULE <br /> <br />The BORROWER shall prepare a periodic progress report which contains a <br />statement of the PROJECT costs expended for that period and shall forward said <br />statement to the CWCB. After receipt of the periodic progress report from the <br />BORROWER, and review and acceptance of the items therein as eligible expenses <br />as described below, the CWCB will pay to the BORROWER the amount set forth in <br />. the report or such portion that has been approved by the CWCS. Such payment <br />shall be made within thirty (30) days from the CWCB's approval of each progress <br />report. <br /> <br />SECTION 8- TIME FOR PERFORMANCE <br /> <br />Project Beginning: Upon effective date of this contract <br /> <br />Project Finish: 1 year from date of this contract <br /> <br />SECTION 9 -ADDITIONAL CONTRACT REQUIREMENTS <br /> <br />Not Applicable <br /> <br />Project Summary - Tilton Lateral, Inc. <br /> <br />Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.