Laserfiche WebLink
<br />SECTION 6 - ELIGIBLE EXPENSES. The following items are eligible for loan <br />disbursements. <br /> <br />A. Preparing final designs and specifications for the PROJECT. <br /> <br />B. Preparing bid and construction contract documents. <br /> <br />C. Preparing environmental assessment or environmental impact statements, and <br />otherwise complying with the Federal National Environmental Policy Act. <br /> <br />D. Complying with all federal, state, and local regulatory requirements, including the <br />obtaining of all required permits. <br /> <br />E. Fish and wildlife mitigation measures required by federal, state, or local laws and <br />regulations. <br /> <br />F. Actual construction as called for in the design documents and in change orders <br />approved by the CWCS and the BORROWER. <br /> <br />G. Engineering services for construction management, including design and <br />construction management for CWCB-approved change orders. <br /> <br />H. Interest during completion of the PROJECT pursuant to Paragraph A.3 herein. <br /> <br />I. Legal services for reviewing engineering services contracts, reviewing this <br />contract, reviewing construction contract documents, and for complying with all <br />federal, state, and local regulatory requirements. <br /> <br />SECTION 7 - DISBURSEMENT SCHEDULE <br /> <br />The BORROWER shall prepare a periodic progress report which contains a <br />statement of the PROJECT costs expended for that period and shall forward said <br />statement to the CWCB. After receipt of the periodic progress report from the <br />BORROWER, and review and acceptance of the items therein as eligible expenses <br />as described below, the CWCB will pay to the BORROWER the amount set forth in <br />. the report or such portion that has been approved by the CWCS. Such payment <br />shall be made within thirty (30) days from the CWCB's approval of each progress <br />report. <br /> <br />SECTION 8- TIME FOR PERFORMANCE <br /> <br />Project Beginning: Upon effective date of this contract <br /> <br />Project Finish: 1 year from date of this contract <br /> <br />SECTION 9 -ADDITIONAL CONTRACT REQUIREMENTS <br /> <br />Not Applicable <br /> <br />Project Summary - Tilton Lateral, Inc. <br /> <br />Page 3 of 3 <br />