My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ02141
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
PROJ02141
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 10:31:26 AM
Creation date
7/17/2007 1:02:06 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150023
Contractor Name
Ryan Gulch Reservoir Company
Contract Type
Loan
Water District
4
County
Larimer
Bill Number
SB 99-173
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
STAT� oF coLor��o <br />Colorado Water Consenration Board <br />Department of Naturai Resources <br />721 Centennial Building <br />1313 Sherman Street <br />Oenver, Coforado 80203 <br />Phone: (303) 866-3441 <br />FAX: (303) 866-4474 <br />August 3, 1998 <br />Mr. Harold Kester, President <br />Ryan Gulch Reservoir Company <br />P.O. Box 299 <br />Loveland, CO 80539 <br />Re: Request for Feasibility Study Grant <br />Dear Mr. Kester: <br />� � . <br />- - — .- .: <br />"—� : . � <br />•�� <br />Roy Romer <br />GOVernor <br />)ames 5_ Lochhead <br />Executive Director, DNR <br />Daries C. lile, P.E. <br />Director, CwC6 <br />I am pleased to inform you that at the July 14, 1998 meeting of the Colorado Water <br />Conservation Board, the Board approved the Ryan Gulch Reservoir Company's request <br />for a feasibility study grant. The Board approved a grant from the Operational Account of <br />the Severance Tax Trust Fund to the Ryan Gulch Reservoir Company for 50-percent of <br />the cost of the Ryan Gulch Reservoir Spillway Rehabilitation Study, not to exceed <br />$5,000. <br />A purchase order will be mailed to you in the next two weeks. You may bill us under the <br />purchase order at the completion of the feasibility study. <br />The study must be prepared in accordance with the Guidelines for Financial Assistance <br />through the Colorado Water Conservation Board Construction Fund, copies of which <br />have been provided to you and your consultant. Please continue to coordinate with Bill <br />Green of our staff on this project. <br />We are happy to be of assistance to the Company in your spillway rehabilitation project. <br />Sincerely, <br />� . � <br />William P. Stanton, P.E. <br />Chief, Project Planning and Construction Section <br />Cc: William Brown, Boazd Member <br />Peter Evans <br />Bill Green <br />Linda Bassi, AGO <br />Ed Toms, Boyle Engineering <br />DNR Accounting <br />
The URL can be used to link to this page
Your browser does not support the video tag.