My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ02141
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
PROJ02141
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 10:31:26 AM
Creation date
7/17/2007 1:02:06 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150023
Contractor Name
Ryan Gulch Reservoir Company
Contract Type
Loan
Water District
4
County
Larimer
Bill Number
SB 99-173
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
' <br />(2) The Colorado water conservation board may make loans for the <br />construction of the project specified in subsection (1) of this section from <br />such moneys as are or may hereafter become available to the Colorado <br />water conservation board construction fund. The loan shall be in the <br />amount listed in subsection (1) of this section plus or minus such amounts, <br />if any, as may be justified by reason of ordinary fluctuations in construction <br />costs as indicated by the engineering cost indices applicable to the types of <br />construction required for the project or as may be justified by reason of <br />changes in the plans for a project due to differing or unforeseen site <br />conditions, errors or omissions in the plans and specifications, changes <br />instituted by regulatory agencies, or changes in material quantities beyond <br />contract limits. <br />(3) Pursuant to section 37-60-120 (1), Colorado Revised Statutes, <br />the Colorado water conservation board shall require such terms and <br />conditions in such contracts as will ensure repayment of funds made <br />available by it. The board shall not disburse any moneys for any loan <br />authorized by subsection (1) of this section unless and until it is satisfied, <br />in its sole discretion, that the recipient of any such loan will be able to make <br />repayment pursuant to the terms and conditions established by the board and <br />by subsection (1) of this section. <br />SECTIQl� 2. Watex project loaa� authorizations from t}�e <br />severance tax trust fund perpetual base accoe�nt. (1) Pursuant to section <br />39-29-109 (1) (a) (I), Colorado Revised Statutes, the Colorado water <br />conservation board is h�reby authorized to loan moneys from the severance <br />tax trust fund perpetual base account to enable the construction of the <br />following water resources projects with the following priority: <br />Priority Borrovv - P�oje�t <br />Loan Amo�nt <br />(a) Southeastern Colorado Water <br />� Conservancy District Water Activity <br />Enterprise* Arkansas Valley <br />Conduit Project $60,600,000 <br />(b) Penrose Water District Water <br />Activity Enterprise Water Rights <br />Purchase and Raw Water Pipeline <br />'�'otal <br />$8 <br />$69,444,570 <br />� <br />� <br />� <br />�..J <br />PAGE 2-SENATE BILL 07-122 <br />
The URL can be used to link to this page
Your browser does not support the video tag.