Laserfiche WebLink
� Ryan Gulch Spillway Rehabilitation Study <br />Plan of Study <br />Page 5 <br />ESTIMATED COST <br />The summary of the estimated task costs are shown in the following table: <br />Task No. Description <br /> � <br />� <br />1 Data Collection <br />2 Hydrologic Analysis <br />3 Alternative Development <br />4 Alternative Evaluation <br />5 Financial Analysis <br />6 Study Report � <br />7 Coordination Meetings <br />Subtotal Salary Costs <br />Subtotal Direct Costs <br />(Telephone, Reproduction, Mileage, and Postage) <br />TOTAL PROJECT COST <br />D:�PROJECTS�RYAN�RAYN.DOC <br />Estimated <br />C ost <br />$192 <br />192 <br />4,820 <br />1,920 <br />768 <br />842 <br />1, 536 <br />$10,270 <br />$630 <br />$10,900 <br />