Laserfiche WebLink
<br />CWCB Construction Fund Loan Applieation <br /> <br />the wells in our group. <br /> <br />WaterRight: _nla_cFS. <br /> <br />Average water diverted per year: _nla_ acre-feet. <br /> <br />6. Will the acquisition of additional water rights be necessary? YES 'J{ NO <br /> <br />If YES, please explain. We will have to get a decreed augmentation plan by the water court <br />that is acceptable to replace the water damage <br /> <br />7. Please list the names and addresses of the ApplicaIJts' engineer(s) and attomey(s). <br />NAME ADDRF!':S ~nd PHONE <br /> <br />Brent Nation, P.E <br /> <br />231 Main Street, Suite 306, Fort Morgan, CO 80701 <br /> <br />8. List any feasibility studies or other investigations that have been completed or are now in <br />progress for the proposed project. Please submit one copy of each completed study with this <br />application. Brent Nation, P.E. <br /> <br />9. Estimated cost of the project. Please include estimated engineering costs, and estimated <br />construction costs, if known. <br /> <br />Estimated Engineering Costs: $150,000 <br /> <br />Estimated Construction Costs: $ 600,000 <br /> <br />Estimated Total Costs: $ 750,000 <br /> <br />10. Loan amoWlt and terms you are requesting. <br /> <br />Requested Loan Amount: <br />Term (length) ofloan: <br />Interest Rate: <br /> <br />$ 750,000 <br />30 <br />2.5 <br /> <br />(Usually 7S%ofEstimaled Total Costs) <br /> <br />yfl'Jl~ (Usually 10, 20, or 30 years) <br />% (Please call for our current rates) <br /> <br />::l <br /> <br />CFLA902 <br /> <br />E'd <br /> <br />'f,OES-E8'f,-01.S <br /> <br />p....a4+aW 5]:....43 <br /> <br />evO=SO EO 10 +00 <br />