My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ02132
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ02132
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:41 AM
Creation date
7/17/2007 11:11:23 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150167
Contractor Name
FL Gill H20 LLC
Contract Type
Loan
Water District
0
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />SECTION 9 - ELIGIBLE EXPENSES. The following items are eligible for loan disbursements. <br /> <br />A. Preparing final designs and specifications for the PROJECT. <br /> <br />B. Preparing bid and construction contract documents. <br /> <br />C. Preparing environmental assessment or environmental impact statements, and <br />otherwise complying with the Federal National Environmental Policy Act. <br /> <br />D. Complying with all federal, state, and local regulatory requirements, including the <br />obtaining of all required permits. <br /> <br />E. Fish and wildlife mitigation measures required by federal, state, or local laws and <br />regulations. <br /> <br />F. Actual construction as called for in the design documents and in change orders <br />approved by the CWCB and the BORROWER. <br /> <br />G. Engineering services for construction management, including design and construction <br />management for CWCB-approved change orders. <br /> <br />H. Interest during completion of the PROJECT pursuant to Paragraph A.4 of the Contract. <br /> <br />I. Legal services for reviewing engineering services contracts, reviewing this Contract, <br />reviewing construction contract documents, and for complying with all federal, state, and <br />local regulatory requirements. <br /> <br />J. Engineering associated with the feasibility report prepared as a requirement for this loan <br />and associated with evaluating the suitability of the water rights for purchase by the <br />BORROWER. <br /> <br />K. Purchase of the water rights. <br /> <br />SECTION 10 - DISBURSEMENT SCHEDULE <br /> <br />For PROJECT costs: The BORROWER shall prepare a periodic progress report which contains a <br />statement of the PROJECT costs expended for that period and shall forward said statement to the <br />CWCB. After receipt of the periodic progress report from the BORROWER, and review and <br />acceptance of the items therein as eligible expenses as described below, the CWCB will pay to <br />the BORROWER the amount set forth in the report or such portion that has been approved by the <br />CWCB. Such payment shall be made within thirty (30) days from the CWCB's approval of each <br />progress report. <br /> <br />For a water rights purchase, the BORROWER shall prepare a written request for funds that shall <br />describe the upcoming closing on water rights purchase including, but not limited to, the name of <br />the seller, cost, closing date, and appraisal value and support documentation in the form of <br />copies of the sales agreement and the appraisal pursuant to Section 7(a) above. After receipt of <br />the written request from the BORROWER, and review and acceptance of the items therein as <br />eligible expenses as described above, the CWCB will pay to the BORROWER the amount set forth <br />in the request or such portion that has been approved by the CWCB. Such payment shall be <br />made within thirty (30) days from the CWCB's approval of each request. <br /> <br />SECTION 11 - TIME FOR PERFORMANCE <br /> <br />PROJECT Beginning: Upon Effective Date of this Contract (the date this contract is signed <br />by the State Controller or his designee). <br /> <br />PROJECT Finish: Two (2) years from the Effective Date of this Contract <br /> <br />Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.