My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ02131
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ02131
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:41 AM
Creation date
7/17/2007 11:11:13 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150167
Contractor Name
FL Gill H20 LLC
Contract Type
Loan
Water District
0
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />I <br />I <br />I <br />I <br /> <br />I <br />I <br />I <br /> <br />Collateral <br /> <br />1. As security for the loan the Gill LLC will pledge assessment <br />revenues backed by assessment covenant. <br /> <br />2. As security for the loan the Gill LLC will also pledge their <br />6 Private Rights of Riverside Reservoir. <br /> <br />Institutional Considerations <br /> <br />The Gill LLC needs authorization to borrow $114,750 from the CWCB <br />Construction Fund. The loan, if approved, from the CWCB will be <br />contingent upon the successful negotiation of a contract between <br />the CWCB and the Gill LLC. Agreements with contractors will be <br />finalized upon authorization of the CWCB loan. <br /> <br />Opinion of Feasibility <br /> <br />The selected alternative is technically and financially feasible. <br />There are no known roadblocks, which would keep the Gill LLC from <br />successfully completing this project. <br /> <br />Feasibility Study <br />FL Gill H20 LLC Aug Project <br />February 2003 <br /> <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.