Laserfiche WebLink
<br />FL Gill H20 LLC <br />March 19,2004 <br /> <br />Page 2 <br /> <br />c) You must adhere to the CWCB DesiQn and Construction Administration Procedures. <br />Tim Feehan will contact you regarding the CWCB requirements concerning project <br />bidding, design, and construction. Tim will make construction inspections, which will be <br />the basis of the monthly pay estimates for disbursement of your loan funds. <br /> <br />On behalf of the Board, I would like to thank you for applying for a loan from the Colorado <br />Water Conservation Board. <br /> <br />~i'nce?%JaJt <br /> <br />Mike erlet, PE, Chief <br />Wa r Supply Planning and Finance Section <br />Colorado Water Conservation Board <br /> <br />Attachments: <br /> <br />Updated Memo: FGH LLC 0304 memo <br /> <br />cc (w/Attachment 1.): <br /> <br />Mr. Eric Wilkinson, Board Member, Colorado Water Conservation Board <br />CWCB Section B Staff <br />Linda Bassi, AGO <br />Chrono File <br /> <br />C: Projects\Proj-New\FGH LLC 0304 Ltr <br />