My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ02109
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ02109
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:40 AM
Creation date
7/17/2007 9:52:00 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0038X
Contractor Name
Upper Yampa Water Conservancy District
Contract Type
Miscellaneous
Water District
0
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />.1 <br /> <br />. <br />., ';j. <br />t,' <br /> <br />HAYDEN DIVERSION PROJECT <br /> <br />1. INTRODUCTION <br /> <br />There are bve irrigation ditches that irrigate some 5000 acres of productive hay lands east of the <br />town of Hayden. One of the largest tracts is the well-known 'Carpenter Ranch now owned by the <br />Nature Conservancy. These five ditches divert out of the Yampa River. When the river drops <br />after the run-off during late July below the level of the inverts of the several headgates, diversion <br />becomes impossible. On a yearly basis, the ranchers go into the river with bulldozers or large <br />backhoes to construct from the river substrate temporary dams which back up the water to a level <br />that will permit diversion into their headgates. <br /> <br />This practice results in the following adverse impacts: <br />1.) It impedes fish and vessel passage. <br />2.) Ranchers are running out of substrate materials with which to build the structures and <br />the time will soon come when it will be impossible to build these diversion dams <br />because the gravel will not be there. <br />3.) The temporary dams wash out every year during the high run-off flows. <br />4.) Remnants of these dams make the river seek a wider streambed causing excessive <br />bank erosion. <br /> <br />From this short description of the project, the need to eliminate the yearly construction at the <br />temporary diversion structures should be apparent. <br /> <br />2. PROJECT SPONSORS <br /> <br />A number of sponsors have banded together to find a solution to the problem outlined above. <br />They are as follows: <br />a.) The Natural Resources Conservation Service (NRCS). <br />The staffhas provided a preliminary study of the project describing a number of <br />alternatives for its solution. They have agreed to provide detailed engineering. <br />b.) The Ranchers, owners afthe ditches. <br />They will be the direct beneficiaries of the project. They are in the process of forming an <br />Irrigation Company so there will be a legal entity with which to negotiate. <br />b.) The Nature Conservancy (I'NC). <br />TNC, a major landowner, receives a substantial amount of project irrigation water. We <br />are depending on them as a project sponsor. <br />c.) The Upper Yampa Water Conservancy District. <br />The district is the prime mover for the project responsible for the management and <br />arranging the funding. <br /> <br />3. LOCATION AND DESCRIPTION OF THE AREA <br /> <br />The Hayden Diversion Project is located in the west central part of Routt County in T6N R87W <br />and 88W at an elevation of 6400 feet east of Hayden, Colorado. The watershed consists of5142 <br />acres. Of the total acreage, 288 acres are urbanized land and 4854 acres are irrigated pasture and <br />haymeadows. The southern boundary of the project is US Highway 40 and the Walker Ditch. <br />
The URL can be used to link to this page
Your browser does not support the video tag.