<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Chapter V - Evaluation of Alternatives <br /> <br />Chapter V - Evaluation of Alternatives <br /> <br />Four factors were used to evaluate the alternatives: 1) Impacts on the man-made environment, <br />the natural environment and the existing social structure; 2) Institutional requirements for project <br />implementation. 3) Technical considerations; and 4) Project costs. <br /> <br />The project impacts related to man-made environment, the natural environment, and the <br />existing social structure are common to all of the alternatives, and are described below. The <br />technical considerations are similar for all alternatives. The costs and institutional requirements vary <br />between alternatives and are described in detail for each alternative. The following sections describe <br />the project's output/yield, impacts, institutional requirements and costs. Financial feasibility will be <br />addressed for the selected alternative in Chapter VI. <br /> <br />A. Impacts <br /> <br />A.I Man-Made Environmental Impacts <br /> <br />There will not be any foreseen environmental impacts to existing dwelling units, commercial <br />facilities, or other structures in the project area, due to the developed alternatives. There are no <br />utilities or roadways that will have to be relocated for the project. The pipe will be installed under <br />Three City of Greeley waterlines using microtunneling to avoid any conflicts. There are no <br />additional lands that would be inundated above the historical impoundment elevation 4959.93 <br />(spillway crest elevation based on City of Loveland 1995 Datum). <br /> <br />A.2 Natural Environmental Impacts <br /> <br />Some wetlands may be impacted during the construction of the outlet works structures. It is <br />likely that a 404 Nationwide and/or Individual Permit from the U.S. Army Corps of Engineers <br />(US ACE) will be required for the project. There are no known endangered species at the project <br />area, but will be investigated during the permitting phase of the project. <br /> <br />Boyd Lake Dam Outlet System Feasibility Study <br /> <br />18 <br /> <br />1f30VLE <br />