My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ02102
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
PROJ02102
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2009 11:21:31 AM
Creation date
7/16/2007 3:14:31 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0045FX
Loan Projects - Doc Type
Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Grant Application - CWCB Construction Fund <br /> <br />Form Revised December 16, 1999 <br /> <br />encompasses the upper Colorado River and its tributaries in Summit and Grand Counties <br />to the Kremmling gage. The project includes the towns and wastewater treatment <br />facilities in the counties. <br /> <br />4. Please provide a brief narrative description of the proposed project or study including <br />purpose, need, facilities, and service area. (Attach separate sheet, if needed.): <br />Concept Paper Attached. <br /> <br />5. Please explain why you are requesting a grant, instead of a loan. (The <br />Construction Fund exists primarily to provide low interest loans for the construction or <br />rehabilitation of Raw Water Projects. Grants are approved only when the project or study <br />is of State interest and benefits a wide range of people and organizations, and/or a large <br />geographical area. The applicant(s) must also show that they are financially unable to <br />repay a loan): <br />NWCCOG does not have taxing authority. Its funds are dues-based. Though, <br />NWCCOG initiated the project, it cannot provide significant amounts of money to the <br />project. The [mancial sponsors, mentioned above, have already contributed <br />approximately $120,000 and the project received a $50,000 grant from Department of <br />Local Affairs. However, due to unforeseen complications in gathering in-basin water use <br />data, the project is projected to run over-budget by $32,972.00. <br /> <br />6. <br /> <br />Will the acquisition of additional water rights be necessary? YES <br /> <br />NO X <br /> <br />If "NO", describe existing rights: The project will work within the framework of <br />participating entities' existing water rights. <br /> <br />Water Right: N/A CFS: N/A Average water diverted per year N/A <br />Acre-feet N/A <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.