My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ02100
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ02100
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2009 11:31:41 AM
Creation date
7/16/2007 3:08:38 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0045FX
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />UPCO Scope of Work Modific{ltions <br /> <br />, <br /> <br />February 17,2000 <br />Page 2 <br /> <br />water users were unable or unwilling,to provide any meaningful level of information on <br />their water rights. Hydrosphere therefore had to develop this information independently. <br />this additional effort include4developing estimates of historical daily demands based <br />upon census and land use records. Daily demand records for recent years were not in <br />electronic form and had to be hand entered. Several trips to the State Engineers Office <br />were.required to' obtain over 100 water rights decrees and augmentation plans. Th~se <br />documents had to be reviewed and interpreted to provide detailed operation information <br />for input to PACSM. Projected future demands, which were only available in monthly or <br />annual amounts, had. to be disaggregated to a daily time-step, based upon current and <br />historical daily demands. . <br /> <br />Hydrosphere had original,ly planned'to prepare a memo summarizing the information <br />collected about iIi.-b<:\Sin water supply systems. However, due to the greater level of detail <br />required forPACSM, the scope of this effort had to be expanded to include preparation of <br />detailed operating memoranda and node descriptions for each in-basin water supply <br />system. These operating memoranda will then be returned to in-basin providers for <br />review. Thiswill allow in-basin users to confirm their water use and portfolios. Once <br />cOIlfirmed,this will ensure that the model is based on accurate information. These <br />memoranda will also help stakeholders in the solutions phase und~rstand the big picture <br />of water use in the basin. <br /> <br />Task 7: Specify PACSM Modeling Scenarios <br /> <br />Originally, three P ACSM scenarios were defined to represent one existing and two future' <br />demand scenarios for the Denver Water system. With the incorporation of West Slope <br />water supply systems into P ACSM, it will be necessary to conduct a more detailed <br />'review of operating assumptions to define the We.s(Slope components of these scenarios. <br /> <br />Please feel free to call me at (970) 468-0295 x 117 or Lane Wyatt at x 116 if you have any <br />questions or need any additional information: <br /> <br />~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.