My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ02099
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ02099
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:40 AM
Creation date
7/16/2007 3:06:53 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153866
Contractor Name
Colorado State University
Contract Type
Grant
Water District
0
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Dr. Paul Beuselinck <br />USDA-ARS, Plant Breeder <br />University of Missouri <br />Columbia, MO <br /> <br />Dr. Israel Broner <br />Extension Irrigation Specialist <br />Colorado State University <br />Fort Collins, CO <br /> <br />Dr. James H. Rhoades <br />Director (Retired) <br />USDA-ARS Salinity Laboratory <br />Riverside, California <br /> <br />vm. <br /> <br />Estimated Time of Demonstration Project Completion <br /> <br />The estimated time of completion for the cost-share portion of the demonstration project is 12 months for submission <br />of the field results and 24 months for the fmal report (Field harvest data will not be available until the fall of2000). <br /> <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.